Drainage at the site drainage system via
To make a drainage in the area with the help of drainage LaytDrein system, you must follow a certain pattern.
Marking territory
Across the surface area, using peg and rope mark out a future project.
trenching
Ditches dug to a depth of about 70 cm by 20 cm at the bottom of the seal. The width of the trenches varies the width of the tube 40 cm + freedom occurrence.
sealing of ditches
The bottom of the trench is filled and tamped sand layer to 10 cm.
pipe laying
During paving work need to constantly monitor the level of tilt pipes building level.
Backfilling the filter layer
To prevent premature sedimentation laid pipe is filled with a new layer of sand.
Top soil is placed a decorative layer and it is spread well.
If there are specific knowledge and experience can carry out the drainage area with your hands.
But a well-planned drainage system is working properly, promptly and efficiently draining the land.
Eliminate many errors, to calculate angles and choose the best only experienced professionals can Flow project materials.
It is worth noting that the preparation of competent plan will help avoid additional alterations in the future that will significantly reduce material costs the site owner.