Installing fence posts
concreting pillars sampling should be performed in the event that the fence sections are of significant size, and in the presence of large amounts of metal elements.
Earthmoving
After you have carried out safety checks site boundaries, Border pegs pulled the cord, and you can start digging pits or holes for fence posts.
Necessary to dig a pit so that the fence post stood on the outer edge of the boundary with the adjacent portion.
Remove the top layer of soil and deepen the hole in a conventional bayonet shovel bayonet half.
Preparation of the columns for a fence
fence post - This profile 60x60 pipe.
weld armature segments - this is "Anchor" to securely "sitting" in the concrete columns.
Top fittings must be welded perpendicular to the - this part will be concreted on top, bottom valves being cooked at an angle (the lower part of the hole narrowed).
We measure the distance between the posts
Formwork for column
Installing fence posts
In this paper, use the building level. He will need to check the verticality of the pillars of the fence in one direction.
The slots in the formwork
Concreting column fence
tensioned cable - is the level of the top of the column.
Our site has a slight slope - about 40 cm, so we have made in the formwork slots, it makes it easy to customize the top. concrete the level of the entire fence.
Shtykovanie and leveling concrete to the level of a thread
Concreting completed column
As you can see the boundary line is located just on the outside of the column.
Preparing runs
Fence poles ready. We begin training runs. Made lace marking a medium run. Run - This profile 60x40 pipe.
Welding girders and pillars
This part of our site below, so columns concreting is carried high.
Weld
Apparatus fence foundation
Make a concrete plinth. Strip foundation fence.
Arrangement begins with the strip foundation excavation groove width of 200-400 mm and a depth of 400 mm for the future foundation of the fence.
Then set formwork for concrete reinforcement and, more groove is filled with concrete.
timber forms
Formwork fence facade.
installation of formwork
The film will retain the concrete formwork - the so-called laitance.
Fittings
Laid fittings and wiring. To collect 12 primary, although we have used and 16 mm.
corner column
Pouring of concrete over
Removing formwork