Installing fence posts

concreting pillars sampling should be performed in the event that the fence sections are of significant size, and in the presence of large amounts of metal elements.

Earthmoving

After you have carried out safety checks site boundaries, Border pegs pulled the cord, and you can start digging pits or holes for fence posts.

Necessary to dig a pit so that the fence post stood on the outer edge of the boundary with the adjacent portion.

Remove the top layer of soil and deepen the hole in a conventional bayonet shovel bayonet half.

Preparation of the columns for a fence

fence post - This profile 60x60 pipe.

weld armature segments - this is "Anchor" to securely "sitting" in the concrete columns.

Top fittings must be welded perpendicular to the - this part will be concreted on top, bottom valves being cooked at an angle (the lower part of the hole narrowed).

We measure the distance between the posts


Formwork for column

Installing fence posts

In this paper, use the building level. He will need to check the verticality of the pillars of the fence in one direction.

instagram viewer

The slots in the formwork

Concreting column fence

tensioned cable - is the level of the top of the column.

Our site has a slight slope - about 40 cm, so we have made in the formwork slots, it makes it easy to customize the top. concrete the level of the entire fence.

Shtykovanie and leveling concrete to the level of a thread

Concreting completed column

As you can see the boundary line is located just on the outside of the column.

Preparing runs

Fence poles ready. We begin training runs. Made lace marking a medium run. Run - This profile 60x40 pipe.

Welding girders and pillars

This part of our site below, so columns concreting is carried high.

Weld

Apparatus fence foundation

Make a concrete plinth. Strip foundation fence.

Arrangement begins with the strip foundation excavation groove width of 200-400 mm and a depth of 400 mm for the future foundation of the fence.

Then set formwork for concrete reinforcement and, more groove is filled with concrete.

timber forms

Formwork fence facade.

installation of formwork

The film will retain the concrete formwork - the so-called laitance.

Fittings

Laid fittings and wiring. To collect 12 primary, although we have used and 16 mm.

corner column

Pouring of concrete over

Removing formwork

As a result, we have a solid foundation on which our fence will serve us for many years.

Banana leg - yielding Tomato in 2019

Banana leg - yielding Tomato in 2019

This year some excitement around the grade "Banana legs." Today, many people ask about it, what ...

Read More

How to germinate parsley per day. My almost failed experiment.

How to germinate parsley per day. My almost failed experiment.

My goal today - to tell you about an interesting and quite useful experiment associated with the ...

Read More

Packaging "Stepanovna" out of the seeds - still some capacity for picking seedlings

Packaging "Stepanovna" out of the seeds - still some capacity for picking seedlings

In January, you can engage in the manufacture of containers for seedlings, especially if you have...

Read More

Instagram story viewer