Neck buildup septic Tapas
When building a house each thinks about the sink drain. some choose conventional cesspoolsOthers something else, and others autonomous sewerage. Quite often there are situations when installers autonomous sewage treatment plant set Topas in grinding with the ground, and upon the occurrence of spring, surface water floods installation.
Such a situation may arise from the fact when the customer does not advance pronounces the fact that after the installation of the treatment plant in the future, the site will rise. This means that the earth will raise the level of the ground, which will once again to the future flooding.
You as a customer should just know that the treatment plant Topas, Astra and others, should be exposed above the ground at least 15 cm. This condition is important in order to cover over the station has not received the water and flooded the installation.
If you are faced with these situations and the installation will be installed, as it were, in the pit, because the surrounding land is artificially raised. You need to build up the neck of the treatment plant. To raise it to the necessary level to cover exposed at 15 cm from the ground.
Capacity battery drainage
The process of building the treatment plant is not complicated, but in the absence of certain skills and proper tools to perform quality you do not get.
Often faced with a situation when the customer knows what he needs to build the station, but how to do it properly and give the seller may not even treatment facilities. Our client, for example, commissioned a third-party office plastic for the building, but that in addition to the plastic, must be ordered Prudok with which this plastic is soldered to the neck, it is no I suggested. Well, we have reserves and we did it build Tapas station.
Capacity-station begins with the removal of the cover and removal sizes. With that, you need to measure each direction, they are different. Next, cut the tiles on plastic shot sizes.
The cut blanks are processed by a plane wall, the chamfer are cut with certain aspects, for the correctness soldering ducts. Then they order soldered to the neck of the treatment plant. Tubes is soldered to the outer and inner sides.
Upon completion, the station is mounted cap, work capacity of the treatment plant is finished.