How to pour a strip foundation
Strip foundation deservedly is the most reliable of all types of foundation. Such a foundation can serve as the basis for lightweight wooden houses. This type of foundation is also suitable for all buildings with heavy walls and ceilings.
After reading the article, you will already know how to pour a strip foundation, detail show in the photographs the order of foundation construction.
- The construction is always important geological exploration. Geological exploration must conduct specialized organization, they give an opinion on soil, located on the construction site.
- Next comes spot marking construction of the future building, the mandatory imposition of the axes and the installation obnosok
- Do not forget about development of topsoil.
4. cushion device here it is necessary to spread gravel around the perimeter of the foundation poured, and sand the remaining intervals.
5. install formwork around the perimeter of the future foundation.
6. Probably the most important stage - foundation reinforcement, Setting the air holes and the communication (pipes) for utilities.
7. When all communications are routed to proceed Concreting of the foundation, namely to his fill.
8. After pouring the foundation and drying produce dismantling the formwork.
9. As a result of works on filling continuous footing we made it:
The finished result look like. As you can see, in the basement we have received technical holes for communications and to blow.