Useful content

Laying flush (in the walls)

click fraud protection

During the construction or repair of an opportunity to pad flush. This is the best possible moment so proshtrobit wall and thereby reduce the layer of plaster.

Council: Be sure to check the entire wiring, it can be done with an ordinary light bulb.

mount wiring

To begin, draw a line somewhere in your wiring will take place. It is necessary to consider all the lighting, as well as sockets and switches. Do not forget that the distance from the floor to the socket or switch was the same.

When markup is best to use a long spirit level to ensure that the lines are straight and perpendicular to the floor. It is also desirable to note the place where you will mount the wire.

Step 1. Mark the location of the wall boxes for switches and sockets.

Step 2. With the punch cutter with the nozzle drill holes for the boxes, then do Stroebe therebetween grinder.

Step 3. The boxes usually have mounting holes wires, they must break through. Then set the boxes in place and secure them with plaster.

Step 4. After the solution has dried securing box, wires can be laid. To do this, measure the required length of wire and protective corrugated, and set them in Stroebe.

instagram viewer

Step 5. Stroebe and seal the edges of the plaster boxes.

Step 6. Wait until the solution has dried and can install sockets and switches.

Do not forget to straighten the cable before installation, try to avoid sharp bends.

Place Like if you like!

Shish kebab by stopwatch: how much to fry the meat to make it perfect

Shish kebab by stopwatch: how much to fry the meat to make it perfect

Shish kebab is a dish that is often prepared "by eye". We control the frying by the resulting cru...

Read More

Russia may lose leadership in gas exports

Russia may lose leadership in gas exports

The Government of the Russian Federation fully admits the possibility that in 2024 Russia may los...

Read More

Despite all the obstacles, the first string of Nord Stream 2 is ready for commissioning

Despite all the obstacles, the first string of Nord Stream 2 is ready for commissioning

According to the Nord Stream 2 operator Nord Stream 2 AG, from the technical point of view, the c...

Read More

Instagram story viewer