Marking a location socket
Mark on the wall where the outlet is located. A height of 30 cm from the floor is usually sufficient.
The figure shows an exemplary layout for outlets, switches and cables. Also, there are shown the necessary distance from the door and window openings.
The height of the outlet does not have any strict limitations, the main thing is the convenience and aesthetic appearance. Once you have drawn the outlet center is necessary to draw a contour for this purpose take an installation box, attach to the mark and drag circuit.
Drill a hole along the contour of the socket
Using a chisel and a hammer, the extra pieces break off from the concrete hole.
Try the installation box in the hole
Next, you need proshtrobit hole for the cable.
Break hatches cover the hole for the cable.
Clean the hole from dust and prime with.
installation box
To set the box Spread a little plaster holes from the inside.
Insert the box in the hole and press down. A portion of the solution can climb out, remove it after partial drying of about 10 -15 minutes.
After the mixture was completely dried up, you can begin the installation pads. To wire does not come out from the box at connection pads, it is held by a bracket or clamp near the box. Since all living removed insulation by a distance of about 1-2 cm. If stranded conductor, the bare wire twisted into a tight tourniquet.
Box daubed plaster on the outside so that between it and the hole was left gaps
Trowel or spatula removed excess mixture
At block 2 contacts are sockets, if earthed, then 3. The two connect the phase and neutral wires to the third terminal - ground. When properly installed socket contacts must be placed at the bottom. Wires coming up. Contacts may have a screw or spring clip. The first type is more reliable, the second requires less time for installation. Then the excess of wire twisted into a helix and hides at the bottom Escutcheon, so as not to interfere with the installation.
Once the plaster dries, spatula trimming edge surface and removed from the box mixture
A few hours later, when the plaster is completely dry, the edges are ground - box ready for installation
Now you can make the final finishing and after installing outlet.