Foundation for the fence: errors that can not be allowed
Protecting the house and plot should be strong. Therefore, it is important to pay special attention to the foundation for a fence. It depends on how much will stay the fence from him. Without the foundation of a fence hardly will stand for a long time and this can lead to deformation or complete destruction.
Let us examine the major mistakes in the construction of the foundation. The first - the base depth. If the depth of the foundations is too low, it can lead to swelling. As a result, after a while you can see the shift of the gate or the fence, jumping down fixings, concrete cracking, and so on. D. Therefore, the recommended depth of not less than 50 cm., A width of about 40 cm. The foundation must be done below the freezing ground.
During the construction of drying to avoid cracks, the foundation should be watered with water on hot days. If work is carried out in the winter, his veiled polyethylene.
It is not necessary to put a fence near a ditch. If you put a fence on the small recessed base, it may eventually tilt towards the ditch. For this case, you need a more powerful base.
It is important to choose foundation typeThat he steadfastly endured the burden in windy weather, the opening of the gate or frost heave. To block or brick type of fencing is suitable strip foundation. If the site fence made of brick, then consider "on the bank of" how many bricks will subject the seams between the pillars.
It is important to make a foundation for the expansion of columns or pillars gate. For fences of corrugated board is good for the pile foundation supports. Supports for the gate to be done to a depth of half a meter.
selection materials Low quality. Some are trying to save money on materials, as a result of the foundation is not long, not hard. Use the proper cement for the foundation. M100 or M200 Cement is not suitable.
Covers for pillars protect the pillar and foundation from moisture. They are necessary to prevent water from getting inside and destroying blocks pillars.
Keep the solution when mixing is not hit the ground or the like. Do not remove the formwork earlier period. Do this only when the foundation is dry and will get stronger.
Why not put more poles for a fence? So many people think, but this is a mistake. This will increase the cost and unjustified load on himself foundation.
Fence of the sheeting requires proper distance between the pillars (3 meters). Because the length of prof. pipes for the lag - 6 meters. Therefore, after 3 meters easier to attach the joists.
Channel RemontDom: SUBSCRIPTION. Good luck in your work and all the best!