Land improvement: initial stages
Land improvement start with stage layout. Vertical layout portion is a process in which the artificial transformation, modification, or improvement of the terrain. The draft for this type of layout is developed in parallel with the horizontal layout. There are two type of layout: creation of artificial hills and pits embossed different elevations (reservoirs, alpine and so on); natural alignment relief area.
The main purpose of planning is to design beautiful surface, fully compliant with all areas of improvement standards for its further development.
During the improvement area need to pay special attention to the creation of drainage systems and storm sewer. Plants need water, but its overabundance can only hurt them, not help. Properly arranged a drainage system and storm sewer able to remove excess water from the territory of the garden.
Drainage is simple and complex, it can also be open, closed and combined. The most simple forms include drainage ditches, closed with special drainage pipes. To collect water often used drainage wells.
Before you begin landscaping necessary to make drainage. Not less important is the creation of tracks. Approach to their construction should be with all the seriousness and responsibility, otherwise the road will come into complete disrepair after a couple of years.