Stylish one-story building: almost Black, but definitely House. Finishing, internal work

click fraud protection

Terrace, insulation, electrical

An interesting trend is observed among the craftsmen of the portal - having built one house, they will soon start a new construction project. FORUMHOUSE continues the cycle of first-person stories with just such a story.

Stabxxx

FORUMHOUSE member

From the sale of the firstBlackHouseabout a year has passed, probably, I am still young and relatively free, my hands itched to start a new construction.

Terrace, insulation

So the construction went on.
He covered the veranda with oil, painted the protruding elements gray and assembled the steps at the entrance. And also painted the chairs gray, and protection, and looks. By the way, here is the house in the back in the surrounding landscape.

I didn't want to bother with the insulation, so the workers put the stone wool. They put Izorok on the advice of Anatoly. By the way, excellent cotton wool, for me in no way inferior to Parok and much better than any Rockwool. Then he covered it with 200 microns film. Then a lathing made of a bar of 50 × 50 mm for additional insulation. The ceiling was planned with ecowool, so it was reinforced with a Yutafol reinforced vapor barrier + a lathing with a planed inch. Ecowool was brought up and blown out with a layer of 300-350 mm.

instagram viewer

Partitions

And he began to collect the partitions, the SS board of course. At first I tried to insulate the joints with reinforced tape, then with aluminum, in the end I spat on all this nonsense and bought a normal delta, found a guy on Avito who was selling it at retail. This, of course, is scotch tape so scotch, dead simple. Then they went around all the windows, joints, abutments, etc.

Dragged and installed a camera from a friendly, but virus-prone country. By organizing the connection according to a temporary scheme.

Partitions for the convenience of electrical wiring and as a leveling layer under the gypsum chipped OSB 9 mm.

This is the end of the summer of 2018.

Electrician

He drew up a project for the location of lamps and sockets, and the invited electrician assembled the shield and began to scatter a web of wires around the house. All NYM wiring. Stretch ceilings were planned, therefore, before the lamps, they calmly threw them along the ceiling lath.

The shield is in my pantry, where I also store a bunch of all kinds of tools.

I also brought the lighting outside, to the veranda canopy. LED lighting. At night, it illuminates not only the veranda very well, but you can also walk around the site, you can see everything.

View from the street.

Don't forget to support the story with like!

Stylish one-story building: almost Black, but definitely House:

  1. Start
  2. Preparation for construction
  3. Assembling the frame
  4. Metal and wood facade
  5. Finishing, internal work

Subscribe to the channel, we have prepared a lot of interesting and useful publications. Repost in your social networks, for sure, someone from your acquaintances will benefit from this experience! Join the FORUMHOUSE!

Think insulation is enough?

Grow delicious and good tomatoes on beds

Grow delicious and good tomatoes on beds

If you grow tomatoes in open ground, then you need to pay attention to the following points. To ...

Read More

SIP connectivity options to a modular machine

SIP connectivity options to a modular machine

Now the overwhelming number of cases as an input in the house using SIP with conductor cross-sect...

Read More

Overhaul of the holiday home. Part 1

Overhaul of the holiday home. Part 1

Beginning with this review, we begin a series of photo reports about our company carried out work...

Read More

Instagram story viewer