Do-it-yourself roof of an anti-crisis house for 63 thousand

click fraud protection

Construction, installation, estimate

FORUMHOUSE presents a first-person story about ultra-budget construction.

purecoder

ParticipantFORUMHOUSE

Construction of a house 6x7 meters from a gas block with an open ceiling in one hand. In detail each stage, estimate, video.

Gable roof with non-expansion (sliding) rafter system

All is vanity... Said the Ecclesiastes once. But I really like the hustle and bustle on my site, building a house brings pleasure and joy! Especially when the work is going well, and the house takes on more and more obvious features. Let me remind you that my house is one-story - 6.2x7 m, made of expanded clay block, a gable roof attic type (open ceiling), all in the best traditions of minimalism, coupled with competent optimization of the construct and the use of all resources, including labor. According to the plan, it will not exceed 300 kilo rubles - the construction of the whole house, and I can confidently say that everything is working out.

Ridge run and Mauerlat

I have a ridge run 7 meters long, so I spliced ​​it out of 3 boards 5x15 cm at random, all over carpentry rules, tightening as necessary with reinforced pins, as well as punching nails in a checkerboard pattern and etc. I will not list everything here. I polished it with a grinder with a grinding disc. In general, it turned out great and durable. Experimentally leaned it on blocks and jumped on it, checking the deflection. The ridge girder approximately in the center rests on a post spliced ​​from the same 2 boards. A powerful concrete curbstone was poured under the pillar.

instagram viewer

On top of the wall I made an armored belt made of reinforced concrete 5 cm thick. Just in case. According to my calculations, it would not be possible to do it at all, since my roof is not spread. Concreted studs. Mauerlat collected from 2 boards 5x20 cm. section. I did it according to the rules (I don't remember what the connection is called), pulled it off with a hairpin, pierced with 2 powerful nails 20 cm. long.

Rafter system

The width of the house is 6.2 m, divided in half by a ridge run, the rafters of 5x20 cm rest on it. with a gash, and overlap, tightened with reinforced pins, and also pierce with 1 good nail, just in case. The excess is cut off. I chose the length of the rafters so that the overhang was 40 cm.

Before installing the rafters, I finished laying the pediment with additional elements - I sawed the expanded clay block in size with a grinder. To do this, I baited the rafters closer to the wall, applied a template from a board to the size of the block (this is easier than lifting the block each time), drew a line along it, focusing on the upper edge of the rafter. Then he applied the template to the block, marked it with a wax marker, sawed it off, put it down - everything is clear.

Why did the roof change

As God sent me one comrade, he knocked right on the door, introduced himself as a manager of some company and offered such prices, from which my eyes went up, but for the better. I didn't even think about using corrugated board, according to my plan, I had bituminous ondulin (yes, all because of the price). Apparently the company opened recently and gained clients for itself by dumping prices well. Of course, I had doubts, they say, but whether they will throw, or send a marriage. Therefore, before ordering, I personally went to the office, and did not order by phone in the business card that the manager left. The building of that company turned out to be a non-working day due to the fact that the light was turned off for them, and they told me where their warehouse was, so I went there (as if God helps). I was personally convinced of how they work, talked to a hard worker who told me what and how, what quality materials, and so on. I touched it, felt it, calmed down, ordered it, a week later brought it on a manipulator - everything is fine. Price - 270 rubles / m², 0.45 mm thickness, C20 profiled sheet.

I chose the color of the roof dark green (RAL 6005), although there are brown around the roof, a neighbor was still passing by and asked “Do you want to stand out?”. But how can I say, green is my favorite, besides, an ecologist by profession.

Roof installation

And the other day I finished the installation of corrugated board and skate, improving my skills as a spider-man). I was pleased with the results of the work - of the jambs on the roof, only that once fell between the rafters and broke the diff. membrane. But he patched the hole with a thread, nylon, so as not to rot. And so everything is within the normal range, everything is smooth. By the way, I'm building a house for the first time, completely alone, with rare exceptions - in this case I called a friend to put the ridge run into place, because I didn't want to spend money on a winch.

Estimate

  • Boards for rafters 50x200 mm (14 pieces, 0.84 cubic meters) - 8800 rubles.
  • Boards for Mauerlat 50x200 mm (2 pieces) - 1200 rubles.
  • Boards on a ridge and support 50x150 mm (5 pieces) - 2400 rubles.
  • Bars for crate 50x50x6000 mm and for filing from the side of the pediments (with a margin + 1 piece, 22 pieces in total) - 4500 rubles.
  • Biosecurity (2 banks) - 1000 rubles.
  • Reinforced studs, 12 mm (4 pieces) - 400 rubles.
  • Self-locking nuts (5 packs) - 150 rubles.
  • Wide washers - 350 rubles.
  • Jute rope, to lift the ridge run (7 m) - 450 rubles.
  • Wax marking pencils - 90 rubles.
  • Maklovitsa brush - 80 rubles.
  • Nails 200 mm - 130 rubles.
  • Self-tapping screws 90 and 110 mm - 200 rubles.
  • DSP in bags of 25 kg. (10 bags) - 1600 rubles.
  • Wooden lath for linings, (1 piece) - 100 rubles.
  • Diffusion film Unispan (2 rolls) - 1200 rubles.
  • Reinforced mounting corner (fix the support bar) - 40 rubles.
  • Mounting plate (3 pieces) - 300 rubles.
  • Wood screws 30 mm (5 packs) - 50 rubles.
  • Self-tapping screws 65 mm (1 package) - 300 rubles.
  • Profiled sheet 0.45 mm, C20, color RAL 6005, 3.77 meters long (14 sheets) + ridge 2 m (4 pieces) + roofing screws (450 pieces) - 23,000 rubles. with delivery.
  • Coniferous lining, Norma grade (in Leroy Merlin), and slats - for filing overhangs, but there may be spotlights - about 2500 rubles.
  • Vapor barrier, if there is a layer of insulation of 15 cm, then foil (1 roll) - 1900 rubles.
  • Insulation with one layer of 5 cm, and 1 layer of 15 cm Knauf for the roof - 11,000 rubles.

In total, about 63,000 rubles, plus you can add 3% - the admission that gasoline was spent on trips to the hypermarket may have forgotten to write something out of small things.

Don't forget to like it!

More first-person stories - in the thematic section.

Stone house, second light, in one hand, for 300 thousand:

  1. Foundation for 31 thousand
  2. Almost free replacement for a concrete pump at a superbudget construction site near Anapa
  3. Revised the project and shrank to 250 thousand at the construction site of a stone house near Anapa
  4. Anti-crisis house box in three weeks and 53 thousand
  5. Do-it-yourself roof of an anti-crisis house for 63 thousand

Subscribe to the channel. Share the publication, let this story become an incentive for your loved ones. Join the best portal about construction and country life FORUMHOUSE!

What do you think is better, ondulin or corrugated board?

Why can't walls be sewn up with plasterboard? How long will drywall walls last?

Why can't walls be sewn up with plasterboard? How long will drywall walls last?

Welcome to the RemontDom channel! Drywall - the most common building material. It is used for lev...

Read More

Unique concrete products for do-it-yourself landscape design

Unique concrete products for do-it-yourself landscape design

Unique art objects for landscape design on the site are of great value. Yes, and there are very f...

Read More

We collect Zucchini already in June. Sharing my secret of growing early zucchini

Zucchini is glorified as a dietary, vitamin, seasonal vegetable for universal culinary purposes....

Read More

Instagram story viewer