Useful content

How much does it cost to build a brick country house? All the stages have puzzled me

click fraud protection

I do not like all this newfangledness.I calculated the cost of a house of 24x12 meters in one floor. The foundation is made of fbs 2400x400x600, the number of blocks is 450, the price per block without delivery is 1000r, the price of laying work with delivery is 315tr. Hollow-core slabs 6280х1200х220 in the amount of 20 pieces (basement) + 20 pieces (1st floor) at 9000 per piece.

The cost of delivery and installation work is 150,000 rubles The walls are single hollow bricks, the volume of bricks is roughly 139569pcs. the price is 8 rubles apiece. Bricklaying work 560000 rub. Insulation 80tr, works 180tr.

Bricklaying. Photo source: volgaproekt.ru
Bricklaying. Photo source: volgaproekt.ru

Roof: 200t.rub metal tile, 140tr barriers and snow holders, 100,000 rafters-lags-lathing, 260tr work. yes, I also forgot the screed in the basement made of expanded polystyrene concrete = 346000 rubles with work. total without windows and doors: 4,257,552 rubles, house area 288 sq m, price per square 14783 rubles, plus a free basement with an area of ​​288 sq meters (you just need to figure out how to use it).

instagram viewer
Brick houses are more liquid in the secondary market than obscure chicken coops made of materials made on a knee in a garage... Prices are real, verified by calls to suppliers of materials and services.

Conclusion: for myself, I decided for a long time - the house should be with a basement, insulated slabs on the ground are not interesting to me. The basement is connected to the ground at a depth, and it is more or less warm there. In winter, it is not cold in such a basement, I saw how they make a gym there, so calmly in the cold without a stove it was possible to train, with there was no screed on the floor in the basement, and the floor level of the first floor was + 1200mm, that is, a whole meter of the basement wall was sticking out on frost.

Of course, I will not make such a high base for myself and the heat loss will decrease in proportion to the reduction in the protruding base. The floor of the first floor, again, needs to be minimally insulated, a polystyrene foam screed and a leveling agent are enough. for brick walls, an armopoyas is not needed under the roof, also a plus.

And no compromises on additional rooms, which will require many in the future - laundry, drying room, boiler room, gym, workshop, soundproof room for enjoying the sound, pantry for trash, ventilation chamber for the ventilation system, normal switchboard, sauna, showers, a whole spa center can be done, you can fantasize lot.

Bricklaying. Photo source: prinzip.su

In this case, only finishing work is needed. And if you don't need these premises, then just don't go there. Then you just don't have to complain that there is no space, the storage water heater hangs in the toilet and spoils the view, under the pantry I had to adapt a room with a window and build outbuildings in order to make a junk storage there and workshop ...

Author: Dmitry."Send your articles to [email protected] and we will publish them! "

Subscribe to our channel, there are a lot of interesting things about summer cottages, as well as new projects of country houses every day!
How to make a metal front door yourself, the choice of material, the stages of work

How to make a metal front door yourself, the choice of material, the stages of work

After I completed the basement and covered the first floor of my house with reinforced concrete s...

Read More

Windproof film on the roof

Greetings.I live in the private sector and have seen a strange picture for several years now.The ...

Read More

Stylish small size. Or 5 visual techniques for the bright design of modest square meters

Stylish small size. Or 5 visual techniques for the bright design of modest square meters

I am sure that you have been advised more than once to decorate a small space with only light col...

Read More

Instagram story viewer