How to pour self-leveling floor

click fraud protection

Having decided to cover the floor in your apartment with linoleum or carpet, to prepare it, you just need to lay a rough screed. If you prefer laminate, parquet or 3D flooring, then their installation requires a finishing screed. Today we will tell you how to perform a screed using a bulk shelf, when the base for it is already completely ready.

Cooking Tools

To fill the floor you will need:

  • a drill with a mixer attachment;
  • a pair of needle slippers for moving around the poured floor;
[caption id="attachment_15429" align="aligncenter" width="300"] Needle Slippers[/caption]
[caption id="attachment_15429" align="aligncenter" width="300"] Needle Slippers[/caption]
  • four containers: two for mixing the solution and two with water for washing the mixer;
  • squeegee and studded roller.

Work is best done with an assistant, as the solution dries pretty quickly.

Read also Filling water floors with your own hands: important subtleties

Preparing the mixture

The preparation of the mixture begins in one of the containers provided for this purpose.

instagram viewer
Attention! During cooking, the mixture should be poured into water, and not pour water into the mixture!

Mixing the solution with a mixing nozzle should be carried out at high speed for about four minutes. After that, the mixture is left for five minutes to ripen, and then transferred to the assistant for re-kneading. At this time, it is necessary to start preparing the mixture in the second container.

Attention! The mixer must be rinsed in water after each kneading.

Pouring the mixture

The pouring of the finished mixture is carried out in strips. In order not to splatter the wall, do not pour too close to it.

[caption id="attachment_15430" align="aligncenter" width="600"] The process of pouring the mixture[/caption]
[caption id="attachment_15430" align="aligncenter" width="600"] The process of pouring the mixture[/caption]
Read also How to make a self-leveling floor with your own hands, part 2: leveling compounds

Leveling

Leveling is carried out with a squeegee in such a way as to obtain the required coating thickness.

[caption id="attachment_15431" align="aligncenter" width="600"] Leveling the mixture with squeegees[/caption]
[caption id="attachment_15431" align="aligncenter" width="600"] Leveling the mixture with squeegees[/caption]

Removing bubbles

In order to remove air bubbles from the spilled mixture, it should be walked over with a spiked roller.

[caption id="attachment_15432" align="aligncenter" width="523"] Removing bubbles with a spiked roller[/caption]
[caption id="attachment_15432" align="aligncenter" width="523"] Removing bubbles with a spiked roller[/caption]

Filling should continue until the entire floor surface is completely covered, after which the screed must be leave for three days to dry, the exact duration of which is usually indicated by packaging.

Read also Repair of cracks in the floor screed: how to do it

If a thick mixture was used for pouring, and the finish should be, for example, a laminate, then it is recommended to re-fill the resulting surface using a thin mixture.

Below we suggest you watch the video, which clearly shows the entire process of filling.

Was our article helpful to you? Want to share your thoughts? We invite you to write about it in your comments.

Budget curbs: take note

Budget curbs: take note

Make a fence for flower beds and flower beds from scrap materialsThe first is a private villa fli...

Read More

Building material very popular

Building material very popular

One of the most common building material is, so-called, oriented strand board, she is oriented st...

Read More

How to equip a studio apartment

How to equip a studio apartment

More and more owners of small apartments studios are willing to turn them into a small studio. Th...

Read More

Instagram story viewer