How to build a stone house with a minimal budget with his own hands: a real experience
How to build an inexpensive house of foam: the foundation, floors, finishing solutions and cost estimates
What do you think to build a stone house can be, if there is no start-up capital, the salary of 30 thousand. rub., the wife in the decree and to raise a child? It seems that this is - unreal. But the user FORUMHOUSE Anton Gerber, nickname portal HotDog, Says the opposite. Want to know how he was able to build your own inexpensive stone house, read our article.
Content:
- Beginning of the epic
- How to make the foundation of the FBD blocks
- masonry foam
- Fill Laying nets
- As the tree override spans in a stone house
- How warm the stone house
- How to decorate the house of foam
- What is the cost to build a house out of foam
I build a house 6x8 m of foam blocks
HotDog
Samostroyschik who erected an inexpensive and comfortable houses of foam for your family
I wondered how to increase the living space for the family. I decided to build a house. Money is almost no experience, too, but I wanted to make the dream a reality. Lucky. Familiar sold inexpensively dry and smooth area of 10 acres in Leningrad region. I had to take out a loan for 450 thousand. rub. and buy the land. Year I studied civil forums. First wanted to build a house from a bar, but outplayed the material in the foam. Incidentally, the "stone" wall material cost me two times cheaper than wood. DIY project is an inexpensive stone house with an attic floor. To equip the entrance to the site. I put the shed and began to build.
First we show you the design of the house of foam, which has developed Anton Gerber.
The dimensions of the house 6x8 m + Attached veranda 3h8 m.
And this is what happened in the end.
Now explain how to build a house on their own for minimum money.
Structural units of PBS
HotDog
First pit dug under the house, the size 6x8 meters. I thought, and decided to immediately combine the foundations of the main building and a veranda. Therefore, the expanded pit for another 3h8 meters. Ribbon foundation under the house. Laying depth of 0.5 m. Did rammed "cushion" of sand and rubble. The basis of the foundation - blocks FBS. Block size -. 1.2h0.6h0.3 I m lucky. Foundation blocks got free from his relatives. After installing blocks over them filled Laying nets. In this work in 2011 and ended with the foundation went to the winter until spring 2012.
Stages of construction of the foundation blocks FBS.
Finished basement.
HotDog I do not forget to make air holes in the base.
Walling cheap houses from aerated concrete blocks
HotDog
In the spring of 2012 I resumed construction of a house. I found cheaper foam concrete blocks. Block size - 60h30h20 see on the walls and partitions 60h30h10 see. DensityD400. They are easier to drag. Total bought 21 cubic blocks and with a supply of glue mixture. More boards bought at the draft floor. Asleep sinus sand foundation and began laying foam.
HotDog He built himself a house on the weekends or in the evening after work. More in-law helped him and his father. Why did not he hired workers? Payment "mercenaries" did not fit into the construction budget.
HotDog
Before laying the blocks, I spread on the foundation of roofing material. I checked diagonal. Exposed corners and began to put the blocks on a string. Dimensions foam walked by 1 cm. Some blocks are harder, some easier. Probably because of the different parties, but adapt himself. After the third row of each second metal reinforced tape. So I came to the windows.
Wall thickness - 20 cm under the further insulation.
The first floor is almost finished.
The next step - pouring Laying nets.
The device reinforcing belts of foam House
HotDog
I finished the first floor. There is the question of how to fix the formwork for Laying nets? Nails and screws in aerated concreteD400 did not really hold. I think the board pull stud bolts and nuts at the bottom of the formwork. Top fill wooden bridge. What do you think - working idea?
Dimastik25
Super Moderator FORUMHOUSE
Instead of studs buy the binding wire diameter of 4 mm. It is cheaper and more reliable. Drill holes in the formwork panels and pull. Between the boards - the bar on the wall width. When pouring concrete bars pull.
HotDog
I picked up the formwork for pouring Laying nets. Even I bought the board for floors, section 20X5 cm. Timber 20x10 cm was not. The span of 6 m. Many of such boards. Therefore, the board will unite two by inserting a spacer between them. Fixing - screw nails.
Formwork ready for pouring Laying nets.
Fill Laying nets solution.
Laying nets ready.
Interim estimates for the construction of a house
- Land for sale - a loan of 450 thousand. rub.;
- Excavator - 3000 rubles .;
- F / B ring septic tank - free from relatives;
- Clay dumping - 2000 rub .;
- Bungalow - 7000 rubles. + Shipping - 1500 rubles .;
- Rubble - drove themselves in the trailer - free of charge;
- Blocks FBS - free of charge;
- Concrete - 4000 rubles .;
- Fittings - it has been in the reserves;
- Sand - 3000 rubles .;
- Foam concrete blocks 20h30h60 cm, 21 cubic meters - 54600 rub .;
- Foam concrete blocks 10h30h60 cm, 1 cc - 2600 rub .;
- Clay masonry units, 25 bags - 4250 rubles .;
- Delivery of materials - 12000 rub .;
- Steel tape for reinforcement of masonry - 1200 rubles .;
- Tools, saw and trowel 2 - 500 rub .;
Total, excluding credit, gone - 95650 rubles.
Note: The prices are for 2013.
Hardwood floors, and roof truss system in a stone house
HotDog
Floor of the first floor, I did so - on the roofing material laid joists - board section 150h50 mm. Additionally, contact the place of wood and concrete missed mastic. Boards twice treated with antiseptic. For fixing the sub-floor to the lower end of the lag board nailed to the issue on both sides of 2-3 cm. sex cake:
- subfloor;
- steam,
- PPP thickness of 5 cm;
- rockwool 10 cm;
- vapor barrier;
- finishing the floor.
Overlapping of the second floor of the twin boards 50x200 mm.
Stages of construction of roof system.
The roof is insulated with foam. Roofing - evroshifer - bituminous sheet wavy shape.
Pediments from the GSP.
Finishing work for the construction of houses made of aerated concrete
HotDog
Before the winter time to make a blind area. More insulate foundation. Reinforcement - mesh-netting. Otmostki thickness - 20 cm. Slightly expanded foundation. The result was a "heel."
In this state, the house went into the winter.
In winter, the work will continue. HotDog insulate the walls from the inside - 5 cm rockwool, placing the plate in a frame made of wooden bars 4x4 cm. I do not forget about the vapor barrier. Decorating the walls - paneling.
Also HotDog install windows, window sills and slopes from scraps lining.
6 windows treated in 25 thousand. rub.
HotDog independently mounted electrician.
Toned grooved floor plank walnut.
And the plaster walls of the house outside the glue residue.
I made stairs to the second floor.
It insulates the floor decks.
And he completed the attic.
Heating homes with electric convectors. Reserve in case of power failure - solid fuel stove.
Also HotDog assembled furniture.
Install a fence.
He completed the veranda.
And finished outside the house imitation timber.
Outside walls additionally insulated stone wool 5 cm.
Sheathing base - steel sheet, cut into strips.
Output
HotDog
I live at home with his wife and two children for two years. Country life in comparison with the city - the sky and the earth. Even build a sauna, an extension to the house, an aviary for the dog to the booth and started to build a children's play complex. Build houses I liked it so much that now I am engaged in it professionally - I lift karkasniki. On the basis of the experience and knowledge I can say that my house is not ideal. There are drawbacks. On the second floor is not enough ventilation. Overlapping of the second floor boards 5x20 cm plays. It was necessary to strengthen. But trick of my house - to meet the minimum budget. To call in the home and live a normal life I have left 1 million. rub. All about everything, given inzhenerki, finishing and some dodelok spent less than 1.5 million. rub.
P.S. Soon Anton Gerber will build yourself another home - the perfect cottage for permanent residence. And of course, he set a goal - to meet the minimum budget.
If you are interested in a house of foam Anton Gerber, the user can ask a question in the subject line I build a house of foam blocks 6x8.
We recommend the article:
- Custom stone house. Construction of 15 years in length or, How to build a custom stone cottage, with virtually no money.
- Winter cottage for 2 days and 500 thousand rubles. In the article, how to build an inexpensive and comfortable holiday house in a block of containers.
- How to build a stone house for 350 thousand rubles with his hands. Anti-crisis way of solving the housing problem - Lift yourself an inexpensive house of lightweight aggregate concrete blocks.
In the video - Anton Gerber says, he built a house for 1 million rublesAnd any mistakes made at this.
Subscribe to the channel! Join FORUMHOUSE - major domestic portal about building and country life!