When our building close to the finish line and left the roof, began the biggest challenges for us
When approached our building, which is called the finish line, and to complete the erection of structures remained roof and porch, started the biggest challenges for us. In - First: was the month of October - the rains began, and those wishing to climb on wet scaffolding was not much, those who agreed to perform roofing work - does not inspire confidence. In - Second: we have not taken care of over the summer to prepare building materials for the roof - stsepiny under the rafters - a long, oshkurennye logs,
propylene with one hand, which are placed on the walls of the house. Bricklaying and foam block we previously paved with roofing material in four layers, lay a planks an inch thick around the perimeter walls by screwing them to the anchor bolts.
But the nine-meter stsepiny (here they are called dissolutions), we could not find. By the end of the summer they are simply nowhere to be buy - sawmill logs whole refused to sell us as to prepare for a summer forest to sell finished products - boards, and those who wallow in the forest plots, generally until December work was suspended because of rain sank appliances, wood was, but on the vine. Drawn prospect to wait until the road does not freeze to on it could drive loaded with Kamaz. After a long search we found where to buy dissolutions, but they do not have to buy oshkuronnye and propylene. We had a lot of work.
One, two - took ...
In mid-October, when the working day was short, and in the morning significantly freezes, we were under the windows piled twelve solid spruce logs. In the evenings, after work to the best of the short daylight hours, my husband, wielding a crowbar as a lever, roll logs, oshkurival their specially trimmed for this shovel and an ax. Saw through, too, had their own - husband rolled a log on the rack, hammered from both ends of the log nails, tied to These specially colored twine strung like a bowstring, beat on the log, the resulting colored trace was line I cut. Had cut along the wood Stihl chainsaw fibers chain snap a three logs after - changed. Little - gradually mastered.
Trust but check.
Roof cover, we agreed to a few people, but later some abandoned, fortunately, two all - did not afraid dank autumn days, and at an agreed price agreed to erect the roof structure and cover it iron. Work has begun to boil, from morning till evening hammering and buzzing chainsaw. We, in turn, perform the promised obligation by providing workers every three days upfront. Two weeks later, our masters sheathed tosom gables and began to nail crate.
And suddenly, when left to sheathe the iron roof, and we gave them all the agreed amount, refused to do the work at no additional cost. The hope was that we would agree to all their terms and conditions, do not leave the same roof is not covered after so much effort and research. Our indignation knew no bounds, but my husband - a man of principle, mountain evicted - workers in the - same day. Not without one more surprise: we have not done a bench under the pediment at the back of the house.
It was very disappointing. And our science: or to register for work, signing a written contract, or not to give money to score until the last nail.
Wing roof with roofing iron, we have different people, for a fee, of course.
But we had no choice. And yet, we have closed the roof, and the lining and canopy had to be left until the next building season. Our building so delayed until December.