As we settled in the bathroom in a small room, annexe
I'll tell you how in a small room, the bathroom annexe implemented. The house was originally adobe, lined with brick, the low ceilings. The interior walls have decided not to break: additional insulation, both thermal and acoustic, but it looked all not very comme il faut, naturally.
Preparatory work.
Sex poured concrete, screed fifteen centimeters thick. We made a mistake that just do not think the warm floor, although it was possible. But then the gasification of the house was only a project, but so absolutely butt of media outlets. Looking ahead to say that in the winter of sex significantly blows cold, it is ice - only to go in slippers or thick socks. But still it is not a kitchen or bedroom, is not as critical, if you're low on money.
On the floor I went to the most common tile, without any frills.
With the crumbling adobe walls to mess they did not want done simply and tastefully. Around the perimeter of the room, and she was an area of almost eight meters, tightened the screws on the frame made of metal sheets. Further insulation type "Ursa", or in the common glass wool, and then in turn went to moisture barrier film. In parallel with this work went on layout and wiring a socket. And of course, pulling plastic pipes as a sewer, as well as under water. Yes, under the radiators, under the heating of the future, in the walls, too, sewed up the board. When the time came to hang the battery (the gap turned out per year), in a tile to drill a hole special nozzles to drill. Since heating is essentially "outside" the installation subsequently spent a bit of time.
Plus, Profile sewn planks in targeted areas, in order to subsequently mount them everything you need, for example, mirrors, towel hooks, cranes, other bath and laundry paraphernalia.
And of course, boiler, white handsome "Atlantic", arranged so that the water inside is not in contact with the heating element "dry PETN", so-called. No, this is not advertising. Boiler regularly works more than two years at the moment, so if pondered choice, then pay attention to the model of this brand. Under water heater whole system "pillars" have developed, tested repeatedly, hanging loads. Water heater eighty liters, after all.
decoration
When working with walls used water-resistant plasterboard, they sewed up the room completely, and then the seams and holes from the screws plastered. Stitched plastic ceiling, straight white sheets.
The next step was to again work with the walls - tiles, again, water-resistant glue. Once finished with tile hung and connected the boiler - kept running.
After came the turn of the bath. We decided to take aluminum, as cast iron, though durable, with all due respect - the last century. A light aluminum and easy to transport and install, well specified in the guarantee, then change it is clearly easier than cast iron, even if it is somehow spoiled for ten years. But this matter, if funds allow, we can and steel, and cast iron supply. Yes, at first, by the way, it seemed that the water is too much effort into this very capacity of the aluminum, but much inconvenience it did not deliver, and are accustomed to the sound quickly.
results
All you think about it, it turned out, even more than expected. Of course, the area of the room, "ate" the frame and drywall, but the ceiling has become even visually appear higher, due to the white glossy plastic.
On that channel everyone can share its experience in the construction, repair and improvement of your home, suburban area, send photos, tell me about your country, house, apartment. And we will tell you about my little house on the canal. Information and photos (preferably horizontal) send to [email protected]
Subscribe to channel MY HOUSE - in front of a lot of new and interesting information!