Useful content

Apartment in new building surrendered with the combined bathroom and toilet, which needs to be corrected

click fraud protection

The family of four separate bathrooms question is very serious, and time on opposite sides of the bathroom door, as you know, is at a different rate. The apartment is in a new building with an economy gave up finish with a combined bathroom and toilet, it was necessary to change on their own and with a minimal set of tools and budget.

They were first dismantled door, and with the help of punch and chisel, was placed under the toilet door opening of 60 cm, the same aperture future bathroom.

I punch BOSH HUMMER 2500: not a professional model, but with a task handled. Porous brick, from which the walls are made thick but fragile.

Then was bought foam block sizes 600h2500h100 mm. The most delicate, but perfectly suitable for the construction of light walls that will not carry a heavy load. To glue adhesion to foam block with plaster was the highest, it is necessary to use a primer such as "Concrete-Contact." In my case, materials such as glue and primer used brand "Volma". Spatula, mix pail and nozzle-mixer for the gun - that's almost all tools that I needed.

instagram viewer

Mark up all the required dimensions, using a tape measure. Verticality is determined using a spirit level.

Getting to the construction. Pre carefully remove the tiles from the floor under the wall of the future, clean the surface from dust, process the ground, waiting for drying, and proceed to the installation. It is imperative that concrete blocks placed with the seam offset. For convenience, you can use a metal section as a guide. Every four rows along the wall was placed a steel rod, for greater reliability.

After laying the blocks must remain distance to ceiling - about 5 centimeters. It must be filled with foam. It provides soundproofing and closes the loop, increasing the structural strength.

When the work on the construction of walls made, you can proceed to the installation wiring. We have to remove the old wires and replace them with new ones with a diameter in the appropriate functionality. Before shtroblenie better acquainted with teh.reglamentom and make wiring layout to not further damage the cable during installation, such as lockers. In the bathroom I did the wiring in the two sockets (always with protection from moisture), a sconce over a mirror, four lights on the ceiling and ventilation. All three switches. Extractor fan in the bathroom works when you turn on the light.

After separation of the toilet can move for placing and plumbing connection, and then to the finishing of the toilet room and the bathroom tiles.

On that channel everyone can share its experience in the construction, repair and improvement of your home, suburban area, send photos, tell me about your country, house, apartment. And we will tell you about my little house on the canal. Information and photos (preferably horizontal) send to [email protected]

construction history, repair, arrangement of housing, land, interior design, landscape design, cottage - helpful tips and ideas. Subscribe to the channel - in front of a lot of new and interesting information!

Found a strange DIY tool. I had to remove the backlash

Found a strange DIY tool. I had to remove the backlash

Corner quadrantI decided to improve my guide for a circular saw, it was necessary to set the corn...

Read More

Bright renovation in our new apartment - everything was done by professionals. Coming soon

Bright renovation in our new apartment - everything was done by professionals. Coming soon

Buying a new apartment is a real holiday for a family. Only after that you need to do a good repa...

Read More

The story of an unusual pond or how I made a pit for frogs Part 2

The story of an unusual pond or how I made a pit for frogs Part 2

Just like not all yoghurts are equally useful, not every area is suitable for creating a pond. In...

Read More

Instagram story viewer