Useful content

Plate vibrating table with his hands

click fraud protection

After the construction of the house always comes the turn of the cottage to arrange well: make garden paths, to organize a platform for the patio, etc. AND whenever faced with the high cost of necessary materials and equipment, start thinking about whether to try to make their own hands. Participants of the forum "Home and cottage" share the experience of his creative experiments.

shaker apparatus

Many householders are thinking what to buy special equipment "on time" and so, especially to do it yourself - troublesome and unnecessary: ​​it is easier to ask friends or to rent. Once realsystem I decided that the vibration table he needs to build a pair of twisting paths across the entire site in the six hundredth and parking for cars 30 sq.m, he began to study the information about as independently produce paving slabs and building blocks.

The main reason for such a bold decision was the high price of materials. Tile he planned size 40x40 or 50x50 cm and a thickness of 60-70 mm, with reinforcement. Table made without drawings, only a couple of weeks. They were used trimming 40h20 tube sheet 2.5 mm, a pair of plates 10 mm and the vibrator old, purchased for 500 rubles, with dimensions 1050h550 cm.

instagram viewer

The movable part of the table realsystem located on six cargo valve spring with scraps of rubber hose inside them. The springs are in the cups. In addition, on the perimeter, he secured the return spring. After the test turn manifested first drawback: the sand was going closer to the center shifted to the far right side and strode down to the floor, because the table was not set and standing on an uneven floor. The owner came to the conclusion that it is necessary to make a side.

Table legs were made of pipe 40x40. Better luck next time, because they have turned crooked due to overheating. Realsystem tiles made of concrete with screenings using masonry grid.

To get the white tile, you can mix the white cement (more than usual) with marble chips.

Another forum member, tarasiki, did a little easier, and have made a table without springs (their functions are performed by the tree) and the vibrator motor, replace the last of the washing machine with the "eccentric." Among the shortcomings of their products forumchanin notes a small area of ​​the table, also need to secure the base frame to the floor. As a composition for the manufacture of tiles, he takes one of the 400 th Kramatorsk cement, one part river sand and three parts gravel.

Budget ramming of improvised rubbish

Petr_1 regretted spending money on rent compactors for dumping under the foundation. Rummaging in the garage, the receiving end ferrous metal and the nearby service station, he found everything you need: a drum from a desktop woodworking machine motor from a washing car metal piece 5 mm thick, 30 mm corner pieces, pile various rubber supports of vehicles, metal scraps 2-3-4 mm, 12 mm piece stud and a pair of cylinders under Freon. There's also bummed a piece of wire, switch and starting capacitor for the motor. I bought a belt and two pillows on VAZ PPC for 600 rubles.

A stack of electrodes, five hours welder, grinder and drill, a few alterations vibrouzla, and the result - a vibrating plate, which is quite acceptable Rams small layers of sand. With the help of self-made equipment was rammed pillow under the foundation of the garage and work began on the foundation under the house.

compactors design is quite simple: horizontal cylinder for weight filled with concrete, vertical is made for the water. The front tube - 12 F 1.3 mm openings. As used vibrator drum of a planer. His half Petr_1 cut grinder, in the second half of the set two lead weights.

results: Vibration to the hand does not reach because of the triple vibration isolation. In addition, on the handles wore thermal insulator from refrigeration units. Rammer, working itself moves forward at 60-80 cm per minute, it is only necessary to send. Because the owner found it unreasonable to use a double reverse course and two vibromehanizma, plate has to deploy it to move in the opposite direction.

Also opened another interesting and useful feature of the equipment at the vibrating plate a little swinging from side to side, especially when the rammer reaches the required density. This is a signal that the car needs to be moved to a new location.

After tamping operation, opened a few Petr_1 shortcomingsWho plans to continue to correct. First appeared Loose ballast. Validating plans to strengthen the collars and to make disassembled Chomutov, rather than welded joint - plate can be moved in a disassembled form. To this end, the upper platform with the ballast water tank was made removable, but experience has shown that it was necessary to make a removable ballast directly.

The owner came to the conclusion that the ballast is to be shifted closer to the middle of the plate, and not to place the front - that the plate is not buried at the corners. For the same purpose it is necessary to lift the front "ski" tamping. As it is necessary to better protect vibrobaraban housing, because the gravel fines gets into gear and takes off from there with great speed.

Another refinement should be improved cooling of the engine: at a temperature above +35 ° C is necessary to stop after every 40-50 minutes of operation, to cool the motor. As one embodiment, it is possible to attach axial fan cooler or from the server.

Participants of the forum Tim1313 used for manufacturing such compactors materials: Ploshchadochnyj vibrator IV-98E, RCD thereto iron bed from Soviet drilling machine, with a reactive thrust bushings from Soviet car and a sheet of stainless steel 6 mm 45h70 cm.

The sequence of work: Vibrator fastened to the frame (nasverlili holes, threaded, screw bolts d12), made the pen and through bushings attached to the frame. Using self-created media was attached base plate compactors. Then perpendicular to the two plates are welded to secure the base frame with a drive to the base: they have made four holes and screw d10. Ready tamper painted.

To irrigate the sand can provide mounting canister.

Result: Speed ​​- 6.7 m / min. The day was tamped 10 cubic meters of sand, layers of 10 cm. Quality rammers: barely visible traces of walking.

Minuses: Strong vibration, which appears and disappears, because of this, at the end of the day aching joints of the fingers, wrists and elbows. In addition, four hours after the beginning of the tamping, it ceased to be included purchased RCD. The problem was solved with the help of an ordinary wall outlet, the benefit of the handle was attached to the rubber bushings.

Discuss the article and read other materials devoted to country life you can on the websiteFORUMHOUSE.

Subscribe to the channel and put the "Like" so as not to miss the next release!

Squeeze out the batteries all the "juice"

Squeeze out the batteries all the "juice"

Batteries, they can be found, without exception, in every home, and they serve a pretty decent ti...

Read More

How to accelerate the growth and increase the formation of ovaries cucumber.

How to accelerate the growth and increase the formation of ovaries cucumber.

There is nothing better than to taste the juicy, delicious cucumber grown on their own garden. B...

Read More

Proper well: how to arrange the water intake on the site according to the law, domestic alternative

Proper well: how to arrange the water intake on the site according to the law, domestic alternative

The owners of suburban land often decide to build a well. Place for him should be selected in acc...

Read More

Instagram story viewer