Warm shower at the cottage

click fraud protection

Even if vacationers do not live in a country house all year round, in the summer they spend a lot of time there. That is why many are thinking about how to landscape your home and land properly and to create at least minimal comfort. One of the first buildings the country is usually the shower - the easiest and more comfortable, and heated water.

After cottage shower No new posts Foxic rotted away, unable to withstand the next winter test, the hostess has conceived to build a more robust new. Old building, served for ten years, was a plank cabin with a framework of timber 50x50 cm, black barrel on the roof and drain the pit bottom.

To the new structure of the inhabitants of the house presented a number of requirements: it must have been a warm, heated water and a full locker room. Given the limited budget and lack of water supply in the area, Foxic decided to build a wood-fired hot-water in the shower column. According to the instructions This device must be connected to the water supply. To create the required water pressure, the hostess came up to raise the barrel of water higher.

instagram viewer

Thus it was calculated future building height, other dimensions determined on the basis of the shower tray sizes, and column dimensions hosts themselves. So, the size of the shower made 2,5h1,6h2,5 m. The base is laid on the foundation blocks and paving tiles, timber was used 150h100 cm, pre-treated with a preservative.

Under the column for the pan supports have been laid, cut planks for the floor. Turning them, Foxic received subfloor. Then, from a bar 50x50 has been erected frame which new posts outside sheathed clapboard. At the same time construction summed up under the roof.

Since upstairs shower was to establish a barrel with water, the hostess has conceived to make the roof similar to the roof rack of the car. Above pent sloping roof is made of timber framework for a smooth pad. It then installs the barrel, which will be filled with water from the well using a pump.

Finally, it was possible to proceed with the warming of the soul, to do the interior walls and plank floor. The hostess is insulated with rock wool, putting it between the beam. Furniture stapler on top of it cemented parogidroizolyatsiyu. Insulate the entire building: ceilings, walls, and even the door.

A place of passage of the pipe through the ceiling and chimney Foxic processed sealant for parquet color "pine". The rest of the gap near the pallet, boxes, etc. Terminated transparent silicone sealant bath.
The windows were made of polycarbonate, which is left over from the reconstruction of the greenhouse. No new posts roof lay evrocherepitsey, exterior walls covered "Neomid" on top of it installed siding. The interior walls are covered with two layers of "Dyufateksa".

Thermal insulation of walls near Foxic column made of insulating material for the chimney on top of it to fasten the sheets of aluminum foil. Near the entrance are located hanger and bench-woodsheds. box frame made of timber residues and lined with scraps of siding. The seat is made of a floorboard.

The walls were chipped inside lining, paved, sanded and varnished floor mounted column and It is brought to the water, made thermal insulation of walls near the columns displayed chimney and equipped cloakroom.

The plans to make exterior stair-steps, shelves, attachment for watering, mirror on the door, on the roof - a platform for access to the keg and a ladder to it. Area in front of a shower Foxic going to lay tile.

materials:

  • unplaned beams 150h100;
  • unplaned beams 50-50 for the frame;
  • planed timber 50x50 for door opening and the door frame;
  • Lining three-meter class C;
  • Batten h36;
  • steam "Pleneks";
  • insulation Rockwool;
  • evroshifer "Ondulin";
  • cream siding "Alta-profile" and accessories thereto;
  • foundation blocks;
  • Pavement 50x50 cm;
  • sheets for insulation of chimneys;
  • Aluminum sheets for insulation walls near the column;
  • transparent silicone sealant for baths;
  • parquet sealant "Pine";

Equipment:

  • a wood-burning water heating facility "Silistra";
  • chimney with thermal insulation of the "sandwich";
  • flexible hose is;
  • barrel;
  • shower tray.

Summer shower was built Foxic yourself for 3.5 weeks. The first tests of the building withstood successfully. Water is heated in the column quickly: 80 liters - min 20-30. In the shower is very warm due to the stove and the chimney. Held light and electricity - the owner has made the outlet under the dryer and hung energy-saving lamp. Waste water in the pit is not delayed.

Discuss the article and read other materials devoted to country life you can on the websiteFORUMHOUSE.

Subscribe to the channel and put the "Like" so as not to miss the next release!

How to keep Strawberries from birds. Effective folk methods No harm to berries and birds

How to keep Strawberries from birds. Effective folk methods No harm to berries and birds

During the strawberry ripening season, the vast majority of birds will not miss the opportunity ...

Read More

I did the preparation before laying the linoleum. The circular saw helped out

I did the preparation before laying the linoleum. The circular saw helped out

Linoleum pruningI never thought that this tool came in handy for a simple repair, I used to do it...

Read More

7 problems when installing built-in furniture

7 problems when installing built-in furniture

Built-in furniture is popular today among home and apartment owners. It allows you to perfectly c...

Read More

Instagram story viewer