Useful content

Frame house turnkey: stages of construction

click fraud protection

Modern technology frame construction of prefabricated homes have been actively used by companies of our country. Thanks to them are low-rise buildings for recreation and living. Own frame house can be each of an average family. It is available, quickly erected, has excellent characteristics.

Skeleton suburban construction is "transparent" technology and every customer is able to calculate the cost of the work, materials and design. Typically, the cost of such a house built "turn key", 40% lower than a house with the same area of ​​the timber, and 60% lower than the brick house. repair of houses of this type made in the wizard is simple, it can also be attributed to the advantages of frame technology.

Stages of construction of a frame house

Skeleton suburban home building involves the implementation of a number of works:

- Construction of the foundation. This step takes less than 4 weeks and svaechny foundation is built for one or two weeks. Before any work is performed marking and after being installed structures.

instagram viewer

- Production of kit homes. After approval of the project, the documents sent to the company, where, under the supervision of experts created every element of a frame house. Typically, during manufacture of the set coincides with the foundation gasket. According to this, after the foundation work is allowed immediately to undertake the construction of the box and the house frame.

- Installation of the power frame. As a general rule, the installation time - 2 weeks. The basis for the walls serves as a bar. Under the supervision of an experienced foreman performed all work related to the installation of the frame, anchor, sealing, strapping.
- Assembling the outer loop, the installation box. The frame technology construction of houses is carried out installation of the wind protection plates, vapor barrier and insulation. This allows you to make the most favorable microclimate of the building. Also you are installing a roof with a special coating and the installation of doors and windows. This step takes two to three weeks on average.
- Connection of utilities. In most cases, before construction, customers are concerned about water summing up, the well drilling. Over the past two or three weeks builders engaged duct seal, sewage pipes, ventilation breeding, electric wiring and cable mounting dispensing shield.
- decoration. Inside the buildings in accordance with pre-agreed design project or without finishing.

Warm home life for the shortest possible time

The construction turns warm durable frame house 6x6 turnkey, having a large number of advantages over classic cottage construction. As used in the building elements are durable, environmentally friendly, reliable. In a relatively small price, you can get a good comfortable home modern type.

I don't throw away cans from soda: I tell you why I need them

I don't throw away cans from soda: I tell you why I need them

It just so happened that this fall most of my articles on Zen are devoted to the topic of economi...

Read More

Cover the greenhouse with a special film

Cover the greenhouse with a special film

Fiery fireworks, fellow gardeners!They say that the new is the well-forgotten old. I was convince...

Read More

How I made a bent armrest for a sofa

How I made a bent armrest for a sofa

Greetings. In a recent publication, I gave drawings of such a sofa.Sofa. Not folding. Photo by th...

Read More

Instagram story viewer