In continuation of the previous photo report on the work carried out by our company on the arrangement of adjoining area and the suburban area as a whole, in the Klin district, Moscow region, publish regular review. Previous report here.

In this photo report we present the final photos of the executed works on finishing cap thermopanels "Termozit" with ceramic tiles, as well as the result of tiling on the blind area. But first we want to remind the list of works that had been made previously. So:

- it has been dismantled old blind area;
- it was undeveloped
drainage system around the house (reset is executed in the gutter);
- it was undeveloped blind area with wooden dividers, waterproofing, etc .;
- it has been exposed metalwork on the plinth mounted thermal panels and tiles laid on the blind area.

Progress of works: In fact, installation of thermal panels Technology "Termozit" on the cap is described in detail in our last photo report. Below are the final photos of the result of work on finishing cap thermopanels:

instagram viewer

The only thing that I would like to draw the attention - is that after installation of thermal panels, it is imperative perform grouting, to avoid the possibility of the destruction of both the thermal panels and fastening places ceramic tiles. It looks like this (in the middle of landscaped produhi):

We have already talked about the fact that, in parallel with the installation of thermal panels on the basement, carried out tiling on the blind area and the installation of curbs on the perimeter. Upon completion of this work was carried out bedding, leveling a new blind area with the existing site topography. The final result is shown in the photo below:

At this milestone on arrangement of territory has been fulfilled and we begin the following milestones:

- arrangement of tracks made of natural stone;

- furnish two steps, or rather "podkrylechnogo" space;

- tiling on the ground under the parking lot;

- construction of an open veranda;

- reconstruction of the flooring in the bath.

About the data types of work, we describe in detail in our next photo report.

More detailed information on progress of the works can be found in our photo gallery. The total time of work on, finishing cap thermopanels and tiling was 12 days.

  • 1
Fastener tricks, repair life hacks: unscrew the nut, bolt without keys, remove the anchor from the wall

Fastener tricks, repair life hacks: unscrew the nut, bolt without keys, remove the anchor from the wall

If you often have to use bolts, screws, nuts and other fasteners in your work, then it will be us...

Read More

Who created the first capacitor

Who created the first capacitor

Hello dear subscribers and guests of my channel. A capacitor is a radioelement, without which no ...

Read More

What do I do to make the screw cap of a glass jar open easily with my hands?

What do I do to make the screw cap of a glass jar open easily with my hands?

Another purely female life hack from me, but for men too.Yesterday a question arose at work - how...

Read More

Instagram story viewer