Repair of suburban houses and baths. Roof of house and floor bath.

click fraud protection

In this and the next several reviews, we give examples of works carried out by our company in recent years. This review will consider the first part, and in the following are links to previous in chronological order. So.

The task: As part of the repair of a holiday home in the Ruza district of the Moscow region had to perform: repair of the roof of the country house, including the dismantling of the old roofing and installation of a new (Metal); floor repairs in the bath; construction, decoration frame extension to the house, installation of all engineering systems and plumbing; renovated rooms in the house and the chimney. It seems to be.

Progress of works: In this case, the object reconstruction is square log house with a ground floor, are faced brickwork. Cladding is formed on the equidistance from the timber of 50 mm in width of a single monolithic reinforced concrete foundation which is supported both at home and comprising ground floor. Interior decoration home - wall paneling. Below the photo, you can see the object of repair in its original form:

instagram viewer

In an effort to repair the roof of a country house was carried out as follows:

- dismantling the existing roofing (slates);
- dismantling the waterproofing layer (roofing);
- improvement of hydro windproof membrane for existing crate;
- development of new crates and kontrobreshetki under the metal;
- Installation of metal;
- dismantling, installation of frontal straps, stalactites, wind bars, etc .;
- temontazh-installation of the existing drainage system.

It should be noted that in addition to the above list of works, customers were asked to perform the alignment and strengthening truss system, due to the fact that already existing rafters in a few places, "sunk", as well as increased load on the truss system, but the customer decided to exclude this type of works. Now, in order. The first step was to dismantle the existing roof covering:

In the image below, you can see the state of the roof system after removal of the old roof covering:

After dismantling the old roof, the existing crate was processed antiseptic compositions (we production using compounds Neomid), then undeveloped hydro waterproof membrane and lathing kontrobreshetka. Before installation, the entire timber was treated with antiseptic compositions. In the photo below, you can see how it happened:

The next milestone was the installation of new roofing - metal. What you should pay attention because it is the fact that by and large the ramp had to be possible docking (punch) roof extension, which is done in parallel (of which we describe in the following reviews). The result of work on arrangement of the new roof of metal can be seen in the following photo:

In this work on the repair of the roof have been completed. Let's go further... Simultaneously with the replacement of roofing holiday home was carried out works on the reconstruction of the floor in the bath. Bath - lumber, steam inside is decorated with paneling and pomyvochnaya room is lined with plastic panels. The complaint of the customer was to ensure that rotted logs. When was the dismantling of the floor boards, appeared here such a picture in front of us:

As you can see from the photo, the problem turned out to be somewhat larger than it had imagined Customer. In addition to the log, rotten strapping timber. Given the size of the disaster, we have proposed and agreed upon by the Customer the following scope of works on repair of the floor in the bath:

- dismantling of the maximum beam, by cutting out defective pieces;
- installation of power sill around the perimeter and the length of the room divider;
- Installation of new antiseptified lag larch;
- Installation of flooring WPC board.

In the photo below, you can see the repair process, but rather to say the floor renovation in the bath:

On this for today. In the following review we will discuss the following work carried out by our company in the framework of the overhaul of the country house in the Ruza district of Moscow region.

More detailed information on progress of the works can be found in our photo gallery. The total time for the repair of the roof of the country house and the floor replaced in the bath was about 14 days.

Ideal thread sealant. Linen, fum tape or adhesive sealant? From the experience of a plumber

Ideal thread sealant. Linen, fum tape or adhesive sealant? From the experience of a plumber

To avoid leaks, you need to properly seal the threads. Which seal is best? New materials have app...

Read More

End of May: what annual flowers can still be planted by seeds directly in the Flowerbed

Gardeners and gardeners have a lot of worries every season, so it happens that there is no way t...

Read More

How to protect wooden surfaces from moisture and UV radiation: a review of products

How to protect wooden surfaces from moisture and UV radiation: a review of products

No matter how trivial it may sound, but wood was, is and will remain one of the most demanded bui...

Read More

Instagram story viewer