In today's review we will continue the review of the list of works performed by our company within maintenance holiday home in the Ruza district. Recall last photo report, we described the process replacement of the roof and repair the floor in the bath. Today we describe the next stage of work performed by us - the construction of an extension to the framing lumber house, lined with brick.

The task: On the existing foundation, to perform construction framing extensions, including toilet and bathroom. Construction is due to be carried out "turnkey", ie comprise an outer, interior trim, arrangement of engineering systems (water supply, sewerage, sanitation, electrical), as well as installation plumbing.

Progress of works: Let's start in order. Thus, the construction of an extension was carried out on the existing foundation, adjacent to the house on the long side. In the photo below, you can see how it looked at the initial stage:

Here on this foundation and it was agreed by the Customer construction of the frame extension, which includes toilet and bathroom. Entrance to the extension has been planned on the site of the window, which you can see in the photo (above the base).

instagram viewer

So, first thing in the basement was waterproofed by laying roll welds and waterproofing, and then the construction of the overlap began:

Upon completion of the construction of the overlap it is the turn frame erection. Here, the basic requirement - all supporting structures, to the maximum, in addition to fixing reinforced corners or special. fittings must be slaughtered. Below the photo you can see the interim results of the power rack mounting of an extension to the house:

The next step in the construction of an extension to the framing lumber house was the construction of roof system and a bunch of existing and new designs. Here we should pay attention to the fact that when a bunch of existing and new structures in the construction of additional building, you need to look at the type and condition of the mating foundations, roofs, walls, etc. and, then the decision should be taken of the conjugation methods, but in any case must be provided sovobody degree that provides the ability to move relative to each constructions other. This is necessary to compensate for possible shrinkage of new designs and no dangerous strains or stresses in the existing ones. General view of the fact that we've got you can see in the following photo:

After the erection of the power frame extension and arrangement of the roof, it is the turn insulation of walls and exterior. Note that in most cases, insulation we do as follows: first, settling external steam waterproofing. Then, on the frame bearing walls, stuffed lath of 50x50 mm with a bar 600 mm, inside which the heater is laid "Penoplex", 50 mm thick. Then another layer of settling hydro- vterozaschitnoy membrane and all sheathed finishing material agreed with the customer (in this case was an imitation lumber). And only then we go in and carry out insulation of exterior walls on power beams frame. Thus obtained heat circuit minimizing the occurrence of thermal bridges and provides maximum heat retention because its thickness in total is 200 mm. The process of warming and exterior wall framing lumber extension to the house can be seen in the following photo:

Upon completion of the insulation frame and an annexe narzhnoy finish was the turn of interior decoration and arrangement of engineering communications, in which it was carried out the following:

- insulation of the floor and ceiling framing extension "PENOPLEKS" total thickness of 200 mm;
- wall insulation of force frame mineral wool "Rockwool" two layers, a total thickness of 150 mm;
- vapor barrier construction and cladding of OSB;
- arrangement of the floor inclination towards the sanitation ladder by mounting napralyayuschih;
- finishing of walls and ceilings (walls in the toilet extension and hallway are decorated with paneling, bathroom plastic panels. Ceiling, on the same principle - wall paneling and bathroom rack);
- mounted corner, floor, ceiling moldings. Installed interior doors and sills;
- made installation of engineering systems framing extension - water supply, sanitation, sewerage, electricity.

Describe in detail the whole process, we will not, because it will take a lot of time, but ask any questions you can always through the comment form located at the end of each review on our website or by using the our forum. And now just the photos:

The final stage of construction and interior decoration of the carcass of an extension to the house was the installation of lumber plumbing fixtures and other cosmetic work, the process and the result of which you can see in the photo below:

Furthermore, to say so to see all the "live", we recorded a special video for you:

More detailed information on progress of the works can be found in our photo gallery. The total time of work on the construction of an extension to the framing lumber house was approximately 1.5 months.

Orbital launches O2, the world's most powerful tidal turbine not connected to containment structures

Orbital launches O2, the world's most powerful tidal turbine not connected to containment structures

Representatives of the Scottish company Orbital Marine Power issued a statement that the construc...

Read More

Mirrored ceilings and where childhood goes: a selection of construction fail

Mirrored ceilings and where childhood goes: a selection of construction fail

Severe Russian birdhouseIf you think that the construction site will not be able to make you laug...

Read More

Popular cutting board. Carpenter's view

Popular cutting board. Carpenter's view

The end cutting board, in my opinion, has several positive aspects, because of which I prefer the...

Read More

Instagram story viewer