Rough flooring slab to a minimum, and at no cost. I did so, he was afraid of him hodit.π£
It is said that it is impossible to walk on air. But making the first steps of their overlap, I have evolved a different opinion.
Watching a lot of videos on the Internet, as the builders quietly walk on the joists as on the floor, I did not give it much importance.
But when he first climbed to the top, I realized that I could not even take a step ...
β And without this, it was clear that the floor need to overlap. But how to do it and do not spend money at the same time??? That is the main task for me.
Here, in the course went all stocks.
I have written that planned to use the boards of the formwork of the foundation, it is for the same purpose.
In addition to this there are still napilennye two-meter board, after construction of the fence.
In general, everything was more or less long and not decayed, went into operation.
And even with this scenario, all close completely overlap did not work. So we had to do in part by planning where the work will be carried out.
Six-meter board, I would not be tied at all to be able to shift them, if necessary, a two-meter had to grab screws.
It is very important not to leave loose ends hanging.
You think you know about them and certainly never come... But on one of these I almost flew off, even though he knew about it, but still neglected.
As a result, the flooring has turned pieces, but rather broad. And even in this case, each step is done carefully and consciously... But this is only the first time. The more I climbed to the top, so accustomed was the situation, the board seemed stronger, and the height is less.
β And most importantly - this is quite sufficient at this stage.
SUBSCRIBE TO THE CHANNELand put the Huskies π. Then it is necessary not only to go on this, but also to build a ...π