In theory, everyone knows how to take care of concrete. But in practice, it is necessary to adjust to the situation.
Well, another time-consuming phase completed. Laying nets filled and must now survive time.
But the hot sun throws a new job.
As always happensTo the work week was cloudy and rainy. A poured concrete, and how evil the sun shines for two days without a break. I watched the forecast in advance, and it is also not uncommon to podvel.π
Of course, ideally you need.
- Watering concrete every three hours.
- Cover anything from direct sun.
- And so the first few days.
But where did the usual samostroyschika so long? Work, family, and a bunch of parallel cases. At this point, I am able to work properly on the site, on the weekends, but on weekdays go out for 2-3 hours.
I got all that ...
- I shed parallel pouring concrete.
- And two days later in the evening.
β But very watered abundantly that even the walls missing.
Not to ride through the woods, I was getting on top in the center of the house, Connected the pump with a hose and shed all this Laying nets one point. Head missing, so a jet all got out. And in the end the result was like after a good shower.
And I noticed that it was still the sun is shining, the water evaporates from the surface. And the next day I came back later, and without direct sun all the moisture remained Laying nets last longer, and is more absorbent and beneficial.
Cover all the film I was too lazy.
Telling the truth, it is too much trouble, especially in places where the installed studs. Therefore this, I just neglected.
And after two days of sun, returned habitual, rainy summer.
And the very nature made me all the work.
β As a result, at least the surface I crack found, means a strong drying concrete was not. So we can hope for a good result.