Laying nets. What do the formwork, without expensive U-blocks and cutting out the heavy hand?
Masonry walls is finished, that's the next important stage - Laying nets.
In one of his articles, I wrote about the criteria that need my Laying nets, and I chose its design.
It is time to implement all.
β Laying nets, I decided to fill in a relatively small cross-section 150 to 100 mm. This will be enough to sustain the hardwood floor. But his main task for myself, I think fixing mauerlat through studs.
The first stage - the formwork.
I decided to make it permanent. But buying expensive U-blocks I did not want to cut and homemade, the more there was no desire.
β I decided to go the other way, Similar tohow did the jumper above the openings.
Composite formwork of several elements.
These elements had somewhere to take.
As I have said, to cut ordinary hacksaw aerated concrete, I did not want to, because it is time-consuming process, but cut tserkulyarkoy - it's very simple (experience was in the reinforcement series).
The starting material was blocks 100h250h625. Maximum cutting depth 50 mm blade. Therefore pililsya first block on one side, then on the other. And receives the already constructive elements of my formwork.
blocks 100 100 go to the outer part, and 50 100 will be the inner wall. And Wall 300 mm, just niche 100 to 150 come from under the concrete reinforcement.
Just 1 hour I sawed stack of "logs" that was enough for me for the whole house.
β In this case, the main arm protection, because the dust is flying in all directions, and everything is easy and simple.
In the end, I put them in just such a formwork:
π But this story requires a separate story, because there is also has its own peculiarities.