Useful content

Moved 14 pallets aerated vruchnuyu💪. Why do I need it?

click fraud protection

When, as material for the construction of his houseI chose concrete, the important factor was the opportunity to work with him alone.

But then I did not know that with the blocks will have to sweat too.

The close proximity of building materials to the construction site is much easier and quicker process. Especially when it comes to the main material of the walls, the number of which is the largest.

But in practice it does not turn out perfectly. And I had my own features.

I already wrote, as I delivered aerated. So due to the nature of the road and the entrance, the manipulator to stop by my site could not. Therefore units unloaded from the road through a fence as an arrow enough.

So that all the trays are at the entrance to the plot, 5-10 meters from the base. It would seem that everything is close, but these five meters, too, must somehow be overcome.

There are two options.

🏗 Hire a crane and put it all at once to the foundation.

💪 Carry all their own hands.

As you know, I chose the second option and here's why:

instagram viewer

1️⃣ facilities.

Convenience can not transfer their own hands, and in the work at the site.

It happened that when laying me hurt even the small number of units, which I have brought. I can not imagine how I would have turned around there, if standing on the foundation of all pallets.

❗ So when you wear yourself have the opportunity to put everything as comfortable as possible, and make the process of building more comfortable.

Ability 2️⃣ sorting units.

The importance of this, I realized already in operation. I have written a certain number of "battered" blocks that fall into the pallets.

▪ So, when you have all the pallets are on the foundation, then you take what is on top, and only then think what to do.
▪ When I endured on the foundation of the piece, it was You may sort the blocks in appearance, and to determine in advance where to apply them.

❗ As a result, this greatly reduces the amount of various wastes.

➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖➖

Of course we must not forget about the time and effort spent.

But this question, I believe purely individual.

Many times I make unconventional decisions, which are contrary to someone's common smyslu😊. But here everyone "is crazy about her."

At the moment I have suffered, one block, 14 pallets of aerated concrete. And I will not say that he spent a huge amount of time and effort. Of course, if you try to carry all day, as soon as possible, and there, among the trays, and you can stay. 🤮

And when the work is going slowly, casually, then before you know it, as we do not have half of what was brought.

And all this for the most part, because for me the construction of his house - a pleasant process, in all its manifestations.👌

And what else is going on my construction site, read on my channel, and 💥MUST SUBSCRIBE💥.

In simple language how to multiply flower Decembrist at home

In simple language how to multiply flower Decembrist at home

Dekabrist or as it is officially called - Zigokaktus Schlumberger, one of the few flowers that b...

Read More

Rules for the care and maintenance of ficus in the winter

Rules for the care and maintenance of ficus in the winter

Closer to winter for many owners figs becomes annoying surprise that his pet despite the daily c...

Read More

How to choose the right oven

How to choose the right oven

Efficiency heating furnace depends on the proper selection of the furnace and competent its locat...

Read More

Instagram story viewer