Hello friends. Repeatedly met with the opinion that a country house can be built in an amount equal to or less than one million rubles. At the same time talk about this year carried out that way with the 2012th, and since then, even if you believe the official statistics, the ruble "fell" on 50%. But it is better not to believe these figures and understand that during this time the ruble "fallen" at least twice.
But let's put aside their foreign currency for the calculation and try to make an estimate of energy-efficient House of aerated concrete on the basis of warmed Swedish plates. If you are confused by these names, I recommend reading the article on the links.
So, the size of the house:
Width: 6 m / length: 8 m / thickness: 25 cm. /
grade of concrete: M300 (22.5)
Do at home tape or pile foundation - confidently and in a modern way, so we choose the Swedish warmed plate - puff pie from the substrate of sand, insulation, fittings, underfloor and concrete.
A box at home, we need:
- 5 cubic meters of sand =
- 12 cubic meters of concrete M300 = 63 thousand rubles with delivery;
- Penoplex 10 mm - 500 rubles * 48 sq.m. = 26 thousand rubles with delivery;
- fittings (12 mm), we need 1000 meters = (!) 33 000 rubles with delivery + 2000 rubles on clamps for ligation;
- smart home formwork - 30 000 rubles;
- warm floors in the house - 70 000 rubles;
- insulation otmostki - 25 000 rubles;
- gazoblok 625 * 375 * 250 mm = 28 cubic meters = 160 thousand rubles with delivery;
- adhesive for aerated concrete - 28 000 rubles;
- overlap and gazoblok 48 sq.m. roof = 120 000 rubles;
- Windows, doors - 50 000
- Roofing material on the roof of a three-layer - 7500 rubles.
- tools for bricklaying gazoblokov, shtrobleniya channels, spatulas, blenders, etc.) - 100 000 rubles.
- Pipes: fans, ventilation - 10 000 rubles.
Only on these modest estimates on the box at home, we need 527,500 rubles, and after the construction of the box - in the best case, only a third of the total value of the house.
Provided that we are perfectly complied with all the technology, built the house with his own hands, no order proposalAnd did not involve heavy earth and concrete work mercenary force, we can assume that the erection of the house of the box - 1/3 of the total cost of the project.
Thus, even if you do a house in the future with their own hands, the minimum cost of a single-storey house of 48 sq.m. It amounts to 1.5 million rubles. Thus, the budget of 1 million rubles, we do not fit, but the house is more than modest size.