The best season for the construction of a wooden house
When choosing the season for the construction of the house there are two options. The first season, summer. In this case, you should schedule the start of work in April, at which time the foundation is laid. Until October erected walls and finishing begins, which lasts until December and in December the same ends. Advantages of the spring start of work are obvious: a short construction period, its continuous cycle. The entire building occurs when warm and dry weather. The only drawback is also dependent on weather conditions. If you will stand out rainy August, the tree is too moist.
The second season, winter - the beginning of work is October, the foundation must be laid before November. Then he goes to February construction of walls and roofs. Then begin complexity. In March, the air is saturated with moisture, wood soak. Finishing materials inside and outside may warp. Not yet installed heating in the house, which by then covered with a roof, inside created is also very high humidity. What if for the construction of baths or wooden houses selected the cold season? Wait. Do house work in March, and schedule them in May.
2 spring wood dries out, the house will shrink, if not 100 percent. The disadvantage of winter construction is considered to be an increase in working time. But this can be attributed to the merits, since there will be a partial shrinkage. The second advantage - the construction of a wooden house in the winter is much cheaper.
Engineering networks in a country house fitted only when it's warm in the summer. Earthworks associated with the sewer device can not be carried out in morzlom ground. The same applies to work with concrete. But to carry out gas and heating system can be engaged at any time of the year. But for gas, there are time limits. The house should stand for a year before being summed up gas pipes.