The third construction season. I finish building the bath

click fraud protection

I remind you that I have started construction in 2010. (As well as many members of our HBC) with a clean field from scratch. As in that it develops - Watch articles ...

This season started very late in July. On the reasons we were not happy (sad event in the family). In the spring and early summer came a couple of times:

Photo left - on 6 May. Right - June 5.
Photo left - on 6 May. Right - June 5.

What I like to place my site, it's proximity to the forest. Growing willow-herb, rose hips. In some years there are mushrooms. Minus one - mosquitoes in the evening and in the hottest months of midges as gadflies. And then, their number varies in different years.

In midsummer completed the heating system and the circulation of water from the oven: connected via a tube heat exchanger with stainless steel furnace with external water tank to 60l stainless steel.

The walls inside the washer still does not cover.
The walls inside the washer still does not cover.

I forgot to write in the previous section that the door was made in August 2011. of the floor board and mounted on one side of the remnants of lining. It remains to make a canopy. The bars were purchased only aspen board and battens.

instagram viewer

I decided to make a dull curtain. I was a bit vysokovat. The front panel offers access to the inside. But no need to put the foot on the scorching of the board. And they really fired later overdone (long stoked oven) and raised the temperature in the steam room to 120 gr. dry steam. furnace process should always be monitored.

To do this, I bought a thermometer in the steam room and all the utensils: the pots, wooden bucket, clothes hanger. Bath minimal set was ready in mid-summer 2012. But there was not even electricity. Question moved, but very slowly.

Because the door to the steam room was deaf and had no window in it, then used the headlamp flashlight, which included lying on the floor during a visit to the steam room.

The rapidity of heating steam, the thrust in the oven and the amount of wood for protaplivaniya - all happy. I was pleased with the result. But the unfinished details still had plenty. What to do next?

Because from the facade of the bath water washed off blue (TM Senezh), it has acquired from the range of the company, which went to work: Azure for a tree Elan TM. In November of 2011. He changed his place of work. He was replaced by a conventional office at Home office in the position of regional manager of one of the producers of paint products. In this, of course, it was acquired by Blue, which was present in the produced assortment:

Photos from the site alpa.ru
Photos from the site alpa.ru

The color chosen approximately similar to the previous marigold TM Senezh - the color of Oregon. Alkyd Glaze absorbed deeper into the structure of the wood, but it leaves a vapor-permeable, breathable. UV filters in the form of certain components do not give dark timber from solar radiation. I liked that blue gave a little gloss. In water this was not observed.

Made a stand for different dishes and kitchen utensils: a frame made of bars, remains sheathed floorboard. Door bought at the store. Cashing nailed on the door and around the masonry stove.

In September, it has acquired a set of drainage system in the company MetalProfil, the same place where metal roofing: 18m - gutters 4 + 1 + 1 m - tubes, holders, knee funnel - all in color RAL 6005 metal roof. I decided not to save on gutters, although plastic is cheaper. I thought that in the winter they can break if the snow come down from the roof.

Driving with fincom-n.ru site
Driving with fincom-n.ru site

Established under the bias towards the terrace. Difficulties there, the main thing to sustain the small slope.

In mid-October, it has fallen neg. Photo 12.10.2012g.
In mid-October, it has fallen neg. Photo 12.10.2012g.

A few days of vacation decided to spend on the installation of flat sheets of slate, which close the space between the concrete piles. After the first snow was a lot of dirt. the photograph is not very kind. Whether business in the summer ...

Bought size sheets 39h1200h8mm and already in place sliced ​​to the desired height. He digs a trench between the piles vertically set sheets clay and sprinkled on both sides. Later he fixed them with screws to the framework.

Yet in 2010. assistant was dug pit under the toilet. Filled timber 4 under the column for fixing the carcass. So he stood the whole of 2011. I decided to return to this structure, since this is not good - to go into the woods to relieve himself. On the construction of the suburban buildings - read the following article...

***

Read more: Cottage toilet with his hands

Read from the beginning: Why I decided to build a house?

Subscribe per channel, introducing it in the browser bookmarks. There is a lot of information.

Any apartment starts with a hallway! Or 5 practical tips for decorating your entrance to your home

Any apartment starts with a hallway! Or 5 practical tips for decorating your entrance to your home

You are unlikely to spend a lot of time in the hallway. However, the entrance to the apartment, t...

Read More

And we have an office in our apartment, what about you? 6 cool ideas for organizing a workplace at home

And we have an office in our apartment, what about you? 6 cool ideas for organizing a workplace at home

Remote work has both pros and cons. And one of the positive aspects is the ability to work from h...

Read More

To the hostesses on the note! 6 unusual ways to deodorize the air in your apartment

To the hostesses on the note! 6 unusual ways to deodorize the air in your apartment

Alas and ah, but the air in the apartment is much worse than on the street. There is dust, dirt, ...

Read More

Instagram story viewer