In this article I want to describe the progress of work on the device slopes entrance to the garage. For this will be necessary concrete work. Dimensions are defined as follows. The height of the entry 60 centimeters. The depth of the foundation decided to do a similar basic construction.

Width turned out to be more than forty centimeters on each side of the gate and was 370 cm outer dimensions. At length it was possible to take only 5 meters. Based on these parameters, and will make a smooth entry from the street to the garage.

The first thing you need to put the size of the terrain. To do this, you need the following tools: tape measure, string, pegs, hammer. In the corners are hammering beacons. Pull cords. We check the diagonal. adjust if necessary.

Now you can take on digging trenches for the future foundation. Its width is equal to 30 centimeters. Dug two long trench five meters and a lateral connecting ends of the slopes. The depth of the last chosen equal to fifty centimeters.

The next step performed by the apparatus of the reinforcing frame. For this use corrugated rebar diameter of 10 and 12 millimeters. First, I put the vertical bars on the perimeter. Then two horizontal reinforcing belts. They are linked with the main foundation.

instagram viewer

Photo: bouw.ru/userfiles/425_3.png
Photo: bouw.ru/userfiles/425_3.png

To do this, Drill, and then start fitting ends into the holes. the intersection of the horizontal and vertical reinforcement fix binding wire.

In one of the slopes is necessary to provide a process opening. Through it will pass sewer. For this purpose, you need to prepare the formwork. It is designed as a box of a given size, which is installed in a predetermined place.

Photo: vseogarage.ru/wp-content/uploads/2017/11/styazhka-pered-vezdom-garazha.jpg
Photo: vseogarage.ru/wp-content/uploads/2017/11/styazhka-pered-vezdom-garazha.jpg

Used concrete mixer. To prepare the solution took one part of cement 500 and four parts sand and gravel. Water to taste. While mingled concrete filled to the bottom of the existing stones. Then coated with a solution. Ramming possible.

The next day took up the formwork device. It is necessary to fill the slopes above the ground. Poperechka will not refill. It is only in the ground. Therefore, the formwork should be set at two slope. The maximum height of 60 centimeters. Length of the highest portion is 120 cm. Further there is a reduction to the end point, the height of which above the ground 30 centimeters.

Photo: sevparitet.ru/800/600/http/stroy-frost.ru/blog/wp-content/uploads/2016/08/kak-sdelat-vezd-v-garazh-1.jpg
Photo: sevparitet.ru/800/600/http/stroy-frost.ru/blog/wp-content/uploads/2016/08/kak-sdelat-vezd-v-garazh-1.jpg

It was everything from old boards. Somewhere stepped up, and in some cases cut off under the required size. When the boards are ready, it is necessary to put them according to the label. At this stage, better still double-check time.

Solid bring down together. According to the contract the top Poperechka. Do not forget to maintain a predetermined thickness of the foundation. Then you need to install a spacer in the bottom of the formwork. Hammered ends. Now it is necessary to stiffen the structure. To do this, hammering stakes, put braces, add Poperechka in the right places.

Next we proceed to the carcass reinforcement device of this part of the foundation. Vertical bars we had originally laid down to the desired height. It also made two horizontal reinforcing series. Are fastened to the foundation and core construction with vertical reinforcement releases.

After that, we proceed to the concrete works. It is also used stones to fill the formwork. A solution was prepared in the same manner. On the wall of one side of the formwork pulled a cord that corresponds to an end view of the slope. To fill the inclined portion more thick solution was used. Do not forget to ram and rattling concrete form panels for a better seal.

Photo: 1beton.info/wp-content/uploads/2018/12/uklon-beton-1024x682.jpg
Photo: 1beton.info/wp-content/uploads/2018/12/uklon-beton-1024x682.jpg

Formwork dismantled in a few days. Here and there in places of joints of panels formed nodules. They can still be easily removed with a hammer, which we did.

After drying, the treated concrete on the inside of mastic asphalt. Then he fell asleep PGSom resulting capacity.

Channel RemontDom: SUBSCRIPTION. Please Like - thank you!
We pickle cucumbers in a simple and fast way.

We pickle cucumbers in a simple and fast way.

There is a rather interesting and time-tested method of pickling cucumbers. The main advantages a...

Read More

Carrot care in July: crop plants switch to root growth.

Carrot care in July: crop plants switch to root growth.

July is the most important month for vegetable crops, because at this stage the formation and fur...

Read More

"Sponges for pennies

"Sponges for pennies

I make sponges for washing dishes with my own hands. Easy and fastIt would seem that the cost of ...

Read More

Instagram story viewer