Useful content

How to build a shed (photos and drawings)

click fraud protection

The first building on your site - hozblok different cabins

The plot for the construction of future homes are usually empty, without buildings, water supply, electricity, so the first thing you need to take care of a place where to store tools and small construction materials, need to buy and sell container or build an economic unit - cabins with their own hands.

The meter is usually installed at an early stage on the street. Typically digged wide board and panel board is fastened inside the counter is set and supplied electricity. Thus, there is electricity on the plot, which will be needed to operate power tools and more.

Below we will talk about how to build a shed with their hands step by step instructions, estimate, calculate materials to shed 2 2.

Bungalow with their hands step by step guide

By choosing the dimensions of the construction should be guided by any available material, any available means. Material of construction for the plating can use the intake of 1-inch board width 150 mm, length 2 m. Fence board planed on both sides and are selected fourth. As a consequence, in this case, the construction dimensions should not exceed 2x2 m, frame made of 1.9 x 1.9 m in plan.

instagram viewer

Drawing frame cabins with their own hands

The frame construction, it was decided to make a cross-section of the boards 100x50 mm. All details of the construction took only 10 six-meter boards.

Drawings blanks layout directly to the sawmill all the materials were cut to size and delivered to the site. Pre-assembly of the structure can begin to do the roof, if the weather interferes. This design began to gather in the early spring, the street is still snow.

Maybe some frame beams have to be customized in length. The assembly was carried out by means of screws for wood, for future easy removal. Door hozbloka bought bu entrance metal, for little money, ready to lock and the jamb. Mount this door will not be easy.

Sheathing frame board

Inch Planed on four sides. Thickness is not planed boards, due to its "not planed" was in the range 22-30 mm. From the bottom board (133 pcs.) 80 selected most similar thickness, and acceptable in quality boards. After planing difference in thickness it was certainly the case, but this unpleasant fact, it was decided to neglect.

With the help of a circular saw, a quarter climbed from two sides. Dimensions 14x14 mm quarter. The result is a "quartered" board, and a large amount of glazing beads on the liner.

Then begins the wall paneling. Lesson not tricky, the only condition - horizontal boards. It is located a quarter so that rain water flowing down the wall, did not get inside.

Thus, in the garage, hozblok was fully sheathed, made formwork under the roofing material from non-planed boards and the floor of the planed boards, the split in the "quarter". Sheathing fastened with screws on wood 3,5h50 mm.

The foundation for the cabins with their own hands

Finally all the snow come down, a little dried out the land, and it was possible to dig wells for foundation pillars. The bars were stacked in place of the bricks in cement mortar.

surface of the earth in place of the economic unit installation is smooth and has great elevation changes, so the poles are immersed into the ground is not uniform, but the upper surface of the poles lie in the same plane. Work laborious enough, can not do without gidrourovnya.

Sleduyuschi1 step section details all cabins were delivered, which in one night was pulled in the garage. On the foundation pillars were stacked as pieces of roofing and waterproofing base cabins assembled, tested under the diagonal and one of angles was planted shims of hardboard 100x100 mm, as exactly set the foundation blocks are not happened. The base was treated "SENEZH".

Then begins the assembly of the frame. It's all like clockwork, the frame of the evening was going to collect better with the assistant. So to get faster and more accurately.

set input Iron door.

Sheathing cabins

After plating the walls and buildings roof stowage, Deck floor boards are treated with varnish to preserve the original appearance. In the future, can be treated with an antiseptic wall color scheme, do the steps and a small platform in front of the tile structure.

When the cabins ready, it is possible to have electricity and connect lights. Inside you can arrange a table, chairs, kettle, water dispenser, tile, everything you need to stay in the area for a long time.

Your comments?

How I formed the crown of my Money Tree. Step-by-step instruction

The lush crown of the money tree is a real highlight of the interior, especially if it is made wi...

Read More

History. "The plumber was afraid that I would take away the coven" - And how would you do

History. "The plumber was afraid that I would take away the coven" - And how would you do

It was the height of the construction season, applications came one after another, as if it had b...

Read More

When the plot is worth nothing anymore: the conditions for indemnification of the owners will be changed

When the plot is worth nothing anymore: the conditions for indemnification of the owners will be changed

A bill has been submitted to the State Duma to clarify the cases when, with the restriction of ri...

Read More

Instagram story viewer