How do the formwork for the foundation
This article is about how to build formwork for the foundation of the house, garage and other facilities, but you can also use these methods to fill a large concrete spans, such as a patio or deck. Construction formwork not a difficult job, but you have to work patiently and with great care, otherwise you will not be able to pour concrete into the professional. There is a strong misconception that all that is not seen does not matter. Nothing could be more false, and we'll show you a guide how to build for the concrete foundation. Follow our rules, use only the best materials and tools, especially if you are uninitiated.
Building your house foundation is necessary for longevity, so make sure you hire a qualified engineer who will determine the number of rebars.
In order to build formwork for the foundation, You need the following:
materials
- boards for construction formwork
- pins to lock in the position of formwork for concrete
- Timber for mounting forms
- nails and screws for fastening the formwork
- polystyrene sheets for heat insulation of the foundation
Tools
- protective gloves, goggles
- tape measure, carpenter's pencil
- a circular saw
- hammer
Tips
- use shoes or boots so as not to dirty his clothes and skin in concrete
- Thoroughly clean your tools after project completion
- Wear safety glasses and gloves to avoid possible injury
Time
- a few hours of the day
Setting the foundation structure reinforcement
The first phase of this project - the installation of reinforcement structure at the base of the trench.
Smart Tip: First you cook the structure of the reinforcement beams together on the basis of the trench.
Smart Tip: check again the connection between the fitting structure, otherwise the foundation will not withstand the weight of the house.
In this picture you can see a close-up of the reinforcement structure. You should notice that the hard compound and sealed properly welded. Make sure that the reinforced beams are aligned, since the walls are to be built on them. If the gain of the beam is not done properly, the walls of your home will not be maintained properly.
Smart Tip: while building your foundation, the process should be under the supervision of a qualified expert in this area.
If the valve should reliably proceed to the construction of the formwork.
Smart Tip: formwork should be constructed professionally, since it will have to withstand the severity of the concrete foundation.
Construction formwork for concrete foundation
In order to build the formwork for the foundation, you should use high-quality 2 × 10 wooden planks and 2 × 4 connection. Therefore, you should read the foundation plans to see the height of foundation from the ground. Next, you need to do the formwork, as shown in the image.
Further, after the installation of the formwork, you should check whether it is rigid and ensure adequate protection of the brackets.
Smart Tip: for proper foundation insulation, you can set the polystyrene sheets, the outer perimeter of the trench. Thus, during the winter, the temperature inside the foundation will be higher.
In this image you can see close-up the formwork and reinforcement. You should be able to notice that the rebar and beams are aligned and bonded formwork stakes.
Create a form for the foundation - it is a very serious project, so you should be under the supervision of a qualified professional. Also, remember that you must do everything in accordance with local regulations regulate the construction, otherwise you expose yourself to great danger.
Remember that our article has only informative character that you familiarize yourself with the process of construction of the formwork for the concrete foundation. We take no responsibility for your actions, we do not claim that this is the way it should be done. On the contrary, we only show you how we work in some cases.
Concrete can be poured directly from the concrete mixer. If the location does not allow to call a concrete mixer to the site, you can pour concrete pump. in the process of pouring concrete, you will need a vibrator. Vibrator allow release of air a layer of concrete.
Learn more about how to pour concrete concrete foundation.
Thank you for reading our article How to build the formwork on a concrete foundation, and we encourage you to share our articles with your friends via social buttons.