How do I build a brick house or can a dream be budgetary? Block-monolithic foundation
Digging a pit, the device of an unusual tape, video
FORUMHOUSE presents another story of one of the portal members. This time - about the construction of a residential building, also with a relatively small budget. Shares his experience Aslan040.
Despite all the frightening stories (builders and foremen with a bad conscience) decided to build a budget house for 3 million. The most interesting is what will come of it. I will definitely publish the construction process and the price of each stage!
The nuances of the device of an unusual MZFL: blocks, armopoyas
All communications were disconnected, there was no water or gas on the site. It was time to move on. I didn't want to make a basement:
- firstly, the basement is a rise in price (and we have budget construction);
- secondly, I didn't really need it.
The site is below street level, and I naturally wanted to raise it higher. The difference turned out to be significant and it was decided to put a block foundation, because a monolithic one would be more expensive. Below I will leave a link to the video, it will be seen what kind of soil I have. The soil in our city is mostly rocky, which allowed me to put the foundation without a concrete cushion, just on a bed of rubble. The foundation turned out in three rows of blocks, plus an armored belt about 35 cm high.
Backfill note.
Always fall asleep first from the sides and then from the inside to avoid block shifting! Sometimes the site does not allow you to do this, like mine. In this case, warn the tractor driver to be more careful.
Further there will be prices and videos. I apologize that without comments, I just can't edit video. In the future I will try to comment on everything.
Estimate
- What was needed for the foundation.
- Nails (80/100), 10 kg - 700 rubles.
- Digging a pit - 10,000 rubles.
- Crushed stone (12 m³) - 4300 rubles.
- Foundation block (83 pcs, with delivery) - 83,000 rubles.
- Cement (8 bags), knitting wire, dry cutter disk - 3200 rubles.
- Chebura (10 m³) - 3500 rubles.
- Crane (150 rubles each block) - 14,000 rubles.
- Sewerage and water pipes, iron for soldering polypropylene - 4100 rubles.
- Backfill ballast (5 cars) - RUB 10,000
- Sewer pipe (not enough piece) - 400 rubles
- Armature for a belt - 14,200 rubles.
- Knitting wire - 1100 rubles.
- Board 25x120 mm (3 m³) - 24,000 rubles.
- Clamps for fittings - 3000 rubles.
- Backfill tractor - 11,000 rubles.
- PGS (1 car) - 1500 rubles.
- Vibrating machine (rental) - 1000 rubles.
- Knitting wire - 350 rubles
- Clamps - 250 rubles.
- Armature - 3750 rubles.
- Nails - 350 rubles
- I found a pear for filling the belt for free, I had to pay 2,000 rubles for the delivery. roundtrip.
- State of emergency with a neighbor's pillar (the crane operator demolished) - 2000 rubles.
- Crane (pouring concrete) - 4000 rubles.
- Concrete (M300 with delivery) - 40,000 rubles.
- A machine for vibrating concrete - 400 rubles.
- Work (for everything completely) - 90,000 rubles.
- Backfilling of poles (ballast + ASG + tractor) - 5500 rubles.
I won't count to rubles, but total it took 350,000.
Like for details!
How do I build a brick house or can a dream be budgetary?
- How do I build a brick house or can a dream be budgetary? Start
- How do I build a brick house or can a dream be budgetary? Project
- How do I build a brick house or can a dream be budgetary? Block-monolithic foundation
More first-person stories - in the thematic section.
Subscribe to the channel and find out the continuation of the story, and a lot of other useful information. So that others can benefit from the experience of the craftsman, share our publication on social networks. Join the fellowship FORUMHOUSE!
How do you like this type of foundation for a brick house?