Bathroom renovation in Khrushchev before and after: the cost of repairs
All the good of the day, evening or night! Today tell about bathroom renovation in the Khrushchev. size of the room did not allow to accommodate a washing machine, a sink, a large acrylic bath.
By the way, look at the whole story: bath and toilet repairs in hruschevke.
However, thanks to the calculations in advance and plan everything turned out to fit. We explain how it was possible, about the errors and the cost of repairs.
Separate bathroom. bathroom size to repair: 1, 50 x 1.40. Size of the bathroom after renovation: 1.48 x 1.32 m.
The wall between the toilet and the bathroom only 4-5 cm. Therefore, there was no sense to demolish the wall to make the bathroom more spacious.
We stood an old cast-iron bathtub. On top of the former owners have installed an acrylic liner to the foam. This liner is cracked and the water accumulated inside the bathroom and not very pleasant smell. We like to remove the liner, but how clean the bath with foam? They did not bother, and decided to throw away and buy a new cast-iron bath.
choose acrylic bathtub. The most inexpensive in the cost Leroy 8250 rubles. Its size 150h70. After laying the tiles on the bathroom wall size diminished. Therefore, the bath is not included. Our employees have decided to trim its grinder.
look how to shorten the acrylic bathtubIf it is not the right size.
Tile chosen black and white. Such tiles eventually get tired, unlike the colorful, with pictures. Gender - black tile size 42h42 cm. On the walls of tiles in black 3 rows from the bottom, and then white size 20x30 cm. For all tile (walls, floor) took about 10 thousand rubles.
Grout Tile - white and black. 4 kg. the cost - 350 rubles. Almost half remained.
Adhesive for tiles - 25 kg. by price 262 rubles. Rotband for plastering walls - 7 packs of 30 kg. took 3000 rubles. Rovnitel floor Hercules - on 308 rubles 25 kg. 4 bags. (1,200 rubles.). Crosses for tile 2 mm. (200 pcs. - 35 rubles.).
This list of basic materials. Even the little things it took about 12,000 rubles.
Even bought the sink (size 50x60) specifically for washing machines. its cost 4100 RUB. Basin Mixer for 2900 RUB.
Put the tiles on the floor and walls. Then ordered ceilings with 4 lamps (1900 p.).
Shorten the bath, put her on the bricks. To make the screen under the bath, using an aluminum profile. Just 3 sides tightened bars to secure additional bath to the walls.
Then fastened over the sink washing machine. It was not much higher than we would like. But still convenient to wash their hands and wash. Here are just a bad faucet - short. Discharged from the mixer Aliekspress extender.
From this store discharged holder soap on a magnet - a very handy:
Then set the door (12 000 rub.).
Total for repair together with the materials and the work it took about 62 000 rubles.
Channel RemontDom - zen.yandex.ru/remonts thanks in advance for the Huskies, subscribe! Good luck with business.