Free communications from the state, or why it is expensive to build in Sochi (SNT
Many people want to build their own home. And living in it with a sea view is the dream of millions. Let's use the example of the city of Sochi to figure out whether it is really possible to build a house on the sea for a limited budget.
Sea, sun, construction
Houses are of different types:
- Wireframe
- Wooden
- Brick
- Monolithic
- Blocky
In Sochi, frame, block and less often wooden ones are in great demand. Houses from a bar, vulture panels are a very profitable construction. In Sochi, plots cost from 200,000 to 500,000 per hundred square meters, it is also necessary to bring communications to it, which is also quite expensive, the average cost for wiring electricity and water is about a third of the total the buildings.
Communication, or let there be light
TNS Kuban Energo is a very interesting organization, tariffs and connection options are different every time, representatives of this service provider are the most frequent guests in court. If you decide to build a house in SNT, be prepared for the fact that you will lay the line yourself, since for the implementation of the project, they have a year in the contract, and you can guess when they will begin to lay it. There are two ways out:
- Buy light from SNT is 150.000r.
- To carry it out yourself, it will cost, taking into account all the materials, an average of 100,000.
What surprises me in the city of Sochi is corruption, even a house located under a power transmission line can get a residence permit and a building permit.
Water is also a very sensitive issue. The terrain is mountainous and you have to drill deep, about 40 meters, the price per meter is 3.000, you also need to buy a pump, filters and accessories.
So we can conclude that if you want to save money, then it is better to do everything yourself.
House or hut
If you managed to acquire a plot, carry out communications, the house will remain the last stage of construction.
A frame and a wooden house will cost less, therefore, the most expensive is the foundation, and for these types, a columnar one is enough, which will not be more expensive than 60 thousand rubles.
But the terrain is so different that somewhere there is hard rocky rock-hardboard, and somewhere there is a landslide side of the mountain. How lucky you are. I can say one thing, when buying a plot, be sure to order geodesy, otherwise you will have to build a house among the supporting walls.
p.s .:Subscribeper channelMy house- all the most important, useful, interesting is yet to come!Here everyone can share their experience in building, repairing and arranging housing, a suburban area, send photos, tell us about your summer cottage, house, apartment.
Read also:
Beware of unfamiliar furniture manufacturing organizations! Their main plus and fat minus
Why Soviet-era panel houses are not as good as some people think