A wireframe together with his wife at the USHP in Novosibirsk. Roof
Clickfalz roof
Most often in topics about building houses on your own, we are talking about work "in one helmet", and the authors are both men and women. Much less often, a house is built not just by one person, but by a spouse in an equivalent tandem. FORUMHOUSE continues the cycle of first-person stories with just such a construction.
prokopz
FORUMHOUSE member
Hello, my name is Eugene, I want to share with you the history of the construction of my house. We do all the work together, with my wife. Sometimes I invite friends to help me at the construction site. So, the construction of a house is underway in Novosibirsk, p. Garden.
Lathing, knots large
On weekends 06/01/19 and 06/02/19, we were engaged in roof lathing for a folded roof. Board 25x100 mm, dry planed, pitch 100 mm, clickfalz.
I took a closer look at some parts of the frame, suddenly it will be useful to someone...
I shoot from a nailer FUBAG n90, I bought it for the new year at a stock for 7000 rubles. Just a song, I really like it, it cannot be compared with a hand fight. Speed and precision. But at first, the brush ached a little from recoil or from the weight. I order nails from St. Petersburg from a nail gun store. It turns out at a price cheaper than ours in Novosibirsk. Nails are different, for the lathing 70 mm, for the frame 88 mm. I use all sorts of polished and ordinary.
Clickfalz
Our first big bummer at a construction site happened this weekend. They brought us the roof. Not only was it kicked, but also the length was incorrectly calculated. We were mistaken by a couple of centimeters. And the manager did not specify a couple of nuances when calculating, which added another 3 cm to our calculation. In general, all weekend we were busy working on bugs. We sawed the overhangs of the roof. It's a shame, 2 days off from morning to night at a construction site, but the result is not visible.
It's just "EPIC FILE".
First, when I ordered the roof, I indicated the length of the ramp 5.5 meters. The cover will be click-fold, it can be mounted with a fold, the manufacturer bent the edges to me without saying that this fold would take about 5 cm.
Second: I was mistaken not counting the frontal boards that add another 5 cm
As a result, when I tried on 1 picture of the fold, it turned out that the ridge closes just a couple of centimeters, so we decided to saw off the overhangs by 7 cm.
This weekend we are starting to lay the seam on the roof. Also during the week, the frontal boards were painted white.
In mid-June, the rebate latch arrived.
Lay one side down. There is little time for construction, we build in the evenings after work...
A week later we completed the roof, and I show you how it happened.
Step by step, the construction site is moving. Press your finger!
A wireframe together with his wife at the USP in Novosibirsk:
- "Pillow"
- Plate
- How to make farms
- Assembling the frame
- Roof
Subscribe to the channel and find out the continuation of the story, and a lot of other useful information. So that others can use the experience of members of the forum, share our publication on social networks. Join the fellowship FORUMHOUSE!
Do you like seam roofing?