Useful content

Penoplex under screed: insulation and floor leveling. Savings on heating up to 40%

click fraud protection

Warm floor - the health of inhabitants of the house. Penoplex by far the most profitable insulation. It is made in the form of plates. Maximum thickness - 100 mm.

High moisture resistance, sound insulation, heat resistance, environmental friendliness - not all the pros Penoplex. The material is durable and dense. Insulation can be installed on any basis, even if there is trash.

The main thing to do waterproofing under penoplex. Plates are attached spec. screws or with glue. Between the plates glued tape, sealed with foam or glued.

Penoplex under screed

Photo: stroyfora.ru/download/content/201807/image_5b4de30d30de66.95665699.jpg
Photo: stroyfora.ru/download/content/201807/image_5b4de30d30de66.95665699.jpg

To work suitable material of 20-30 mm., Tight. from 31 kg / MK. At warming the floor mnogokvart. house on the ground floor, use penoplex thickness of 4 cm.

Do not forget to build a damper tape around the perimeter of the room. When on the ground, the base - sand cushion. Ground poured gravel bed 30 cm. Over it is possible to pour a layer of expanded clay, for greater thermal insulation (thickness of 1 cm.). Then there is a layer of sand (medium-grained) layer of 1 cm. The base is well compacted and leveled.

instagram viewer

After that fits penoplex. On top of the waterproofing material is stacked. You can use a thick film with a stop at the walls.

Place the reinforcing mesh with a mesh of 100x100 mm or 80x80. It should rise above the heater 2 cm. Make it possible thanks to the specials. cups (spacers) for the grid.

Next, you need to install beacons on the level of (aluminum, wooden poured galvanized profiles). Between beacons distance not more than 1 9 m.

Image: obustroeno.com/wp-content/uploads/2016/08/plity-penopleksa-ukladyvayutsya-na-pesok.jpg
Image: obustroeno.com/wp-content/uploads/2016/08/plity-penopleksa-ukladyvayutsya-na-pesok.jpg

Prepare solution. Ties make a wet or semi-dry method. First poured screed angle. Recommend work leveling screed rule length of 2 m.

The thickness of the screed 4 cm., But depends on the load. Inside ties some place warm floor system. From time to time watered tie. So cement is tightly adhered, and will not crack.

Photo: sk-amigo.ru/wp-content/uploads/styazhka-na-penopleks-tehnologiya-ustrojstva_5.jpg
Photo: sk-amigo.ru/wp-content/uploads/styazhka-na-penopleks-tehnologiya-ustrojstva_5.jpg

Cut off the protruding edge dempf. tape. Prepare topcoat: tile, laminate, wood or others.

Channel RemontDom: SUBSCRIPTION - zen.yandex.ru/remonts. Like for - many thanks! All the best and see you.
What to do with garlic arrows

What to do with garlic arrows

Garlic hands, what to do with them? More precisely how to remove them, pull or snap off. Logicall...

Read More

The control system repair and construction

The control system repair and construction

Perhaps each of you faced with the problem of clear and transparent organization of repair and / ...

Read More

Process garlic before planting

Process garlic before planting

Saying "preparing the sleigh - summer" and is suitable for the garden! Because for a good harvest...

Read More

Instagram story viewer