Houses in a fast way: how long can it take to build a house from aerated concrete, self-supporting insulated wire panels, modular and frame houses (prices, terms)
Everyone agrees that time is money. If you build a house faster, you will spend less on rental housing, a team of builders, gasoline, etc. I would like to build a house quickly, spend a minimum of money and time. It seems that this is unrealistic; the quality of the structure will have to be neglected. But in our century there are many examples when a house is erected in 1-3 months.
To build a house, you need to take into account climatic conditions, choose a material for construction, choose a place (site), determine the properties of the soil.
Aerated concrete house
The construction time depends on the workers, the size of the house, the time of the materials supplied, and the finances.
If you build yourself, then spend at least 5 months on the box (roof, foundation and walls). If you hire a team of 5 people, then the house is 150 sq. m. will be built in 2-3 months. The lowest price from 14,000 rubles. per sq. m.
House from SIP panels
Construction time from 2-6 weeks. Design sometimes takes about 1 week. The foundation will take 1 day. Erection of walls, ceilings, roofs, floors, windows, doors (house area 350 sq. m.) - 1-4 weeks.
The companies offer to build a house (with a rough finish) for 9600 per sq.m. Read more about such a house, reviews, see article.
Modular houses
Structures-constructors, which consist of ready-made elements of a wooden beam or metal. You can put several modules on the site. Price per sq. m. from 9000 rubles. foundation for a modular house: piles, reinforced concrete slab. Pros: The house can be disassembled and moved to another location.
Assembly time is 2-7 days. Manufacturing time from 2 weeks. Large transportation costs. The further away the plant is, the more expensive it will be to deliver the modules to the site. The cost of a turnkey modular house is about 2,400,000 rubles. (house 9x8 m.).
Frame house (cost, calculations)
Construction time: 1-3 months. For example, a house (150 sq. m.) can be built in 4-7 weeks. A house with 2 floors can be built in 3-5 months. Can be built even in winter. A skeleton frame will cost less (by 20-30%) than a good aerated concrete house.
It is better to order the project from specialists (30-40 thousand. R.). For a pile foundation - 90,000 rubles. Frame - 320-430 thous. rub. The roof will also require funds - 160-170,000 rubles. Doors and windows - 140 thousand rub. You can save money on windows. About it told in this article. Facade with drain - 75,000 rubles. House insulation about 130,000 rubles. Rough finishing - 60,000 rubles. For various little things, fasteners - 100,000 rubles.
Eventually a frame with a rough finish without communications will cost approximately 1 million 50 thous. rub. If you build with your own hands, then you will pay for a square meter 10 500 rub. If you hire a team, then the square will cost 20 thous. rub.
House for a million (trick how to save money on construction houses).