Build his dream house, the house budget. Foundation box
Digging excavation and foundation
All communications were cut off: no water, no gas was not on site. It was time to move on.
Cellar I do not like:
- First, the basement, it is more expensive (and we have a budget construction);
- Second, he told me, in principle, was not needed.
The plot is located below street level, and, naturally, I wanted to pick it up. It received significant drop, and it was decided to put the foundation block, because it would have made more solid. At the bottom will leave a link to the video, there will be clear what my ground. The soil in our city mostly rocky, which allowed me to put a foundation without concrete pad, just in the bedding of gravel. Fundam turned in three rows of blocks, plus Laying nets approximately 35 cm.
Note on backfilling. Always fall asleep first laterally and then from the inside to avoid displacement of the blocks! Sometimes the site does not allow this, as I have. In this case, the tractor operator to warn him to be careful.
Next will be the price, and video. I apologize that no comment))) just do not know how to mount the video) in the future I will try to comment on everything.
I will write everything that was required for the foundation.
- Nails (80/100) 10 kg = 700 ₽
- Digging excavation = 10000 ₽
- Crushed cubes 12 = 4300 ₽
- The unit foundation 83 pcs = 83000 ₽ (delivery)
- Cement (8 bags), wire knitting, suhorez drive 3200 = ₽
- Cheburah cubes 10 = 3500 ₽
- Faucet (150 r-1 block) = 14000 ₽
- Water and sewage pipes, for the soldering iron is plus polypropylene = 4100 ₽
- Ballast for backfilling (5 cars) = 10000 ₽
- Sewer pipe (not enough piece) = 400 ₽
- Fittings for Belt = 14200r
- Wire knitting 1100r =
- 25h120 board (3kub) = 24000r
- Yokes reinforcement = 3000 ₽
- Tractor for backfill = 11000 ₽
- Ballast (5 cars), ASG (1 car) = 11500 ₽
- Vibrating machine (rolled) = 1000 ₽
- Wire knitting = 350 ₽
- Clamps = 250 ₽
- Armature = 3750 ₽
- Nails = 350 ₽
- Pear pouring belt found free of charge, I have to pay the delivery truck 2000 ₽ back and forth.
- PE with neighboring post (crane demolished) = 2000 ₽
- Crane (concrete fill) = 4000 ₽
- Concrete (300 grade) + shipping = 40000 ₽
- Vibrating machine for concrete = 400 ₽
- All work is fully ₽ 90000
- Filling of posts: Ballast + CBC + tractor = 5500 ₽
Counting all will not, laziness))) But about 350,000 left.
Wall and Laying nets
With the foundation and dismantle. It's time to put the wall. While engaged in the search for masons times dried up and gained strength (it was three weeks). As it turned out, to find good masons are not so simple (at a reasonable price). We have in the average price of a brick masonry 1.5 (1 roughing and brick cladding 0.5) approximately 1200 r. 1 m². Prices were of course different, up to 2000 p., But I'm not happy about it.
As a result, it so happened that he had found a brigade Dagestani. True except trowel they bring nothing happened. Bribed me is that they are building a home in the past 16 years of our republic. But the people, as it turned out later, come to earn more than build quality. Masonry made beautiful in my opinion, even given the fact that the geometry of bricks have been very bad. But with a belt nakosyachili. But on the doorposts I will talk later.
Since the construction of the budget, I am not chasing a beautiful facade. The aim was to build a new, nice, warm house. the cheapest brick was chosen in our market. Its price was 8 p., But the geometry of it is very bad, you can see in the photo.
The thickness of the masonry was selected 1,5 brick, without insulation, as we have not so cold in the republic. There are of course cold days, but for example, the 2018-19 winter was this: snow fall up to 3 times, and most of the winter afternoon visited zero temperature.
Rough brick was chosen as a local, like normal quality, in my opinion, M150, Price 7 p. Plus more to parse summer kitchen left me with about 3,000 bricks that I decided to put on the central wall.
As I wrote above, except the trowel and the ropes of the masters had nothing, I had to unexpectedly spend money on something which tools and mixer. Plus three daily allocated 500 p. for food.
Next will be only numbers and video.
- Brick 4200 pieces, plus had to pay for pallets - 33850 ₽
- Brick 4000 pieces - 28450 ₽
- Brick, cladding 6550 pieces - 52000 ₽
- Wire and the rest, for electricity in the utility room, where the builders lived - 2800 ₽
- Pallets to make forests - 3000 ₽
- Concrete Mixer - 11000 ₽
- Net, sifting sand - 1000₽
- galvanized sheet trough - 600₽
- Mason's net, 175 m - 1750 ₽
- Hose 30 m - 1200 ₽
- Sand for masonry cubes 10 - 8000 ₽
- Two spades - 230 ₽
- Cement bag 133 - 40000 ₽
- 4 roll roofing material - 920 ₽
- Buckets 5 pieces - 550 ₽
- For liquid soap solution - 800 ₽
- Board 50h150 mm (then went to the roof) for forests 3 cube - 30,000 ₽
- Ebb and wedges of dolomite - 15700 ₽
- Brick 4000 pieces - 28800 ₽
- Plus shipping - 2500 ₽
- Wire knitting, clamps for belt - 3300 ₽
- Dribs and drabs - 200 ₽
- Gloves 10 pieces - 250 ₽
- Dowel - 500 ₽
- Brick - 23600 ₽
- Sand (not enough), 10 cubic meters - 8,000 ₽
- Board 4 cube - 40000 ₽
- Crane to lift the brick house - 2300 ₽
- Fittings on the belt - 20000 ₽
- Nails, wire - 700 ₽
- Concrete M300 - 19600 ₽ delivery
- Tap for pouring belt - 5000 ₽
- For work - 336000 ₽
- Lunch 30 days - 15,000 ₽
- Plus dosypki floor crane (my school, then tell) - 18500 ₽
Only about 423,000 rubles.
At the end of the silent movie again))) Just the process of building walls) I apologize for crowing on video, and that it no comment) I promise, after post about the roof will be a video with commentary!
The following post on the roof glazing of the first and the doorposts.
More information can be found on our website, in stories section.
Start of construction.
Subscribe to the channel! Share on social networks! Join FORUMHOUSE!