To install the washing machine, you must first define its dimensions and location of the installation extinct. The site where the machine is installed, must comply with its size, otherwise the machine will not fit. Then you can start looking for and purchasing the washing machine according to the known parameters.


Steps for installing a washing machine:


1. After unpacking, the machine is in the planned location.

It should be noted that the site for the installation should be durable. If it is a private house and the floors are wooden, you will need to perform a cut-out in the floor and a seat to set a concrete or brick foundations. This must be done because the machine has quite a lot of weight, and when working there are significant vibrations.

These factors can lead to the failure of the wooden floor, so the floor should be durable. The machine is mounted on a level, and exhibited four adjustable legs, fixed on the corners of the machine. Each of the four feet must be firmly with the same force rest on the foundation, or later when the vibration will occur.

instagram viewer


2. Once the washing machine is produced it is connected to mains water and drainSleeves (hoses, pipes), supplied with the machine.

To do this in the lines before the acquisition of the washing machine should be planned coupling with cranes.

If the length of the complete hose is not enough, you need to purchase an extension. Feed water piping is easy to connect to the car, as there is provided the thread on which is wound a hose fitting.

The drain pipe is connected to the car is already with the purchase, and it only remains to connect the sewer pipe. It is connected by inserting a corrugated pipe into the main drain.


It is important to bear in mind that at the outlet from the washing machine drain pipe should be above the floor for at least 25 - 30 cm.

This design requirement is the installation of the washing machine. If this is not done, the machine will not fill with water, and therefore will not work in the desired mode.


3. Connection to the mains. The machine is equipped with a standard power cord with a plug for the conventional outlet 220 - 240 V.

The outlet must be provided in advance near the facility users.


4. Checking the machine in the work carried out after all the connections. Laid a small amount of laundry and the machine is switched on for a minimum operation. If excessive vibration is detected, it is necessary to adjust the height of one of the support legs. When a leakage in the water supply or sewage systems - are pressed fitting to eliminate leaks.

p.s .:My HouseHe is trying to give you the most important, useful information. If you liked the article, please put "like".subscribe to the channel - in front of a lot of useful and interesting information!

Schemes correct connection voltage relay

Schemes correct connection voltage relay

The relay control voltage (RNA) is intended to protect the equipment from high or low voltages. I...

Read More

Weekend project or 24 hours to update the interior of your apartment to no recognition

Weekend project or 24 hours to update the interior of your apartment to no recognition

Good afternoon dear friends!Agree, even well-designed and high-quality interior design may be som...

Read More

Frame house in a helmet: how and what

Frame house in a helmet: how and what

A basic set of tools, which is necessary to the builder, are designed to build your own vacation ...

Read More

Instagram story viewer