The truth about the situation in the construction market: as the dream of own house transformed into a waste of money
The real story of the construction of a dome home, where everything is done correctly - the foundation, frame, wall insulation ecowool etc...
If a you want to build a country housebut you do not have knowledge of building, stop! First, read our article. Let experience Makhmutova Olga and her family will serve as a lesson for you.
OlgaMahmutova
Participant FORUMHOUSE
Story below - the story of the failed construction of a dome home. It describes the bureaucratic circles of hell: court proceedings, civil engineering expertise and work of bailiffs. This - our rake. Post them on public display. Maybe it will help you not to step on them, as we did ...
Content:
- How to build karkasnik that it rotted
- Why carry, can not be left
- How not to build a house to be demolished
Dome house, you can not leave to demolish
First we show you a domed house Olga Makhmutova.
At first glance, it get a lovely home, but it only seems.
OlgaMahmutova
We started to build kupolnik spring 2016. To build it, we sold one-room apartment in Moscow and went to live in a mountain village in the Caucasus. Builders found sort proven. There are firm. Projects. The work performed. We bought construction materials, and construction has begun to boil. We made the foundation. We put the frame. Sheathed it. At this stage, surfaced error. It turned out that the foundation for the interior walls are not located under the walls of the room, and indoor. T. e., the entire load from the second floor went to the ground. "Off" partitions the first and second floors. They told the foreman about it. He says he's okay, and partitions can rely on the tie. We decided to insist on its construction and... vanished. After inspecting the errors went home jamb. The result: construction expertise, recognition of home life-threatening, the court, two years of waiting and 0 rubles compensation. Total counted 24 defect. Verdict - defects can not be eliminated without a complete disassembly of the structure.
List what went wrong:
- Under the project, the diameter of the rubble strip foundation a little less than 11 meters. In fact – 12 m.
- Trying to combine the superintendent bottles like finishing the basement, he failed. Stones stacked haphazardly. Stones of different sizes. The joints between the stones with hand thick.
- With the construction of the foundation is not sustained the horizon. This is a "corrected" over the Gulf of stones leveling screed.
- Depth of the foundation - 30 cm, at a level of 80 cm of soil freezing.
- Insulation no foundation.
- Protivopuchinistye measures to be implemented.
- No blind area.
- Coupler is not aligned, and in the recesses is accumulated water.
- Finishing cap in favor of the facade plane. Low tide there, and the water poured into the house perimeter.
- Wooden frame placed on the foundation without waterproofing.
- Reference to file post.
- Outside there ventzazora. On the roof there aerators. The roof is not ventilated.
- Wood is not flammable and processed bioshield means.
- Wood rots. The house went to the mold.
- Frame lost load-bearing capacity.
What he had done superintendent, it can be clearly seen in the photo below.
Ecowool also laid on the foundation and are constantly getting wet.
What led t. N. "Wet" method of mounting a heater.
Why carry, can not be left
OlgaMahmutova
When I created a portal on the topic titled "The frame house to be demolished. What to do with the foundation? "Showered with advice not to hurry and try to repair and strengthen the skeleton. In my case it is - unreal. The house definitely go for demolition, I just do not know what to do with the foundation. Is it possible to him to build something and also to dismantle?
Readers to understand why the dome decided to demolish the house, we give some quotes from the expert opinion:
- As a result, moisture of wooden structures registered education fissured brown rot and mildew.
- OSB panels are stacked with the violation of the technology. There unacceptable gaps, hem and gaps. There was a shift from the plane of the roof panels.
- Identified numerous defects waterproofing roll roofing.
- Recorded no fire impregnation and protection against biological damage wooden structures crates.
- Part of the load-bearing wooden racks has metallic bonds with elements of horizontal studs.
- Some support arm fixed longitudinal cracks on the entire height of the rack.
Now look at the picture below. You still have the desire - to fix it?
One more time. The house is rotting from the bottom to the top!
OlgaMahmutova
I have children - allergies. Living in such a structure is possible! As for the builders to fix jambs. Well, think. We will have to:
- Dismantle rotten crate.
- Tear off a vapor barrier.
- Remove ecowool because it is moldy.
- Replace the entire fixture in the house.
- To throw most of the wooden frame.
- The remaining wood clean from mold.
- Facade throw in the trash.
It turns out the renovation frame still carry frame, only sounds beautiful.
How to build a house, so you do not regret it for life
And now, 4 circles of bureaucratic hell that had to go through a Member of the portal.
First round - the conclusion of the contract.
OlgaMahmutova
We signed a contract with the construction "firm" - LLC. The contract prescribed deadlines and penalties. More in the contract stated that we are building the "house" instead of "skeleton structure," or "modular sooruzheniT" and elevate it to the "Contracts". Through a combination of "home" + "in a row" we were able to apply to the court at the place of our residence. This is important if those you are building a house, located in a different region.
Second round - reception of the work performed.
OlgaMahmutova
We naively believed that, if the building "firm" made a project at home and builds his own, they are responsible for the quality. If the contract... We have registered all stages of construction. They recorded acts of reception and transmission. But how to check the quality of work? There are two possibilities - you need to understand the construction, or will attract technical supervision. My advice - spend 30-50 thousand. rub. on a third-party specialist. Believe me, if you erect a house for 3-5 million, the money will be repaid. I think if you specify in the contract that the milestones receives technical supervision, most contractors just run away.
Third round - the court and building expertise.
OlgaMahmutova
So, there is an unfinished house with a bunch of stocks. Foreman disappeared. Contact with him is impossible. My husband and I walk around the house and are horrified that we had built. We are doing construction expertise and are preparing a lawsuit. At this stage, there are some nuances:
- If you agree to help the lawyers of the Society for the Protection of consumer rights, then, maybe you do without the assistance of counsel. Thus you will save money.
- Expert is better to call for a visit and consult.I do not recommend just paying the examination, t. To.the court may refuse to accept the opinion of an expert.
- According to the Civil Code of the Russian Federation civil case should be considered by the court within two months. But if the court will appoint an expert, it can be done in three months.
- If you think you keep within six months, then you are wrong. Judge may postpone the examination for three months, and then send a response that is not ready to perform it. Or will delay the case even for 3 months. Total: nine months. We've been through this. And the court will simply extend the deadlines.
Can I bring an expert to justice? By law, you can. That he faces? Drumroll! A fine of 5 thousand. rub. and… Only if there is a court petition.
Fourth round - the bailiffs.
OlgaMahmutova
We went through dozens of hearings. Year went to the examination. Six months on appeal. Court, we won. Bailiffs have received a writ of execution. We thought that now will refund the lost millions. Certainly not! During the trial, the foreman merges all the money from the accounts. Overwrites the property and, as a result, we do not get anything! More bailiffs lost originals of judgments. Curtain. What to do next? Sue the superintendent for deliberate bankruptcy LLC. What does he get for this? It gives maximum of 6 years. What shall we get? 0 rubles! If you recognize the bankruptcy and give life, it will write off all debts. Phoned to the superintendent. We explained that we just have this outlet. He said, "Well, sit ...". Why did I describe all this? I'm not complaining that we have lost 3 million rubles, or that as a result of this epic we now live in the house, which is 70 years, and all the amenities in the street. I remember the words of our neighbor - a wise mountaineer. He said: "Guys, your home is no use to anyone. Neither the builder nor the court or a lawyer. "
conclusions
First of all I would like to thank Olga Makhmutov because she openly talked about her negative experience of construction. We think her story will serve as a warning to novice developers.
So, If you want to build a country houseRemember - the market of low-rise construction in Russia and the wild hopes only on themselves. Of course, at the time of construction of the house you can hire a professional technical supervision. But where the confidence that it will be a competent person who will not disappoint you as well? How to verify that he is telling you the truth and does not deceive, in collusion with the builders, using your ignorance? Circle.
therefore you have two choices – first you are learning construction issuesAt least at a basic level, and only then erect their own home or hire a team and personally control all stages of work.
Advice from FORUMHOUSE: if you can not come every day at the construction site, set on a plot of Internet video camera and watch as you build a house online. Believe me, surveillance motivates workers not to drive hack.
Be sure to read the topic Olga Makhmutova Frame house to be demolished. What to do with the foundation? and its history, How not to build a house to be demolished? The epic about a failed dome-karkasnik.
We recommend the article:
- What causes hiring builders hacks or, The real story about the complete dismantling of the warmed Swedish plates.
- My bomb shelter or how I built the basement for 3 million and realized that the money buried in the ground, and the ground floor - the evil.
In the video - independent examination of the dome homeWhere construction stocks - the car and the truck.
Subscribe to the channel! Join FORUMHOUSE!