Experience advancing economic blocks without using cranes and manipulators

How to move a shed? As easy as pie. Book a car with a manipulator. Crane lift up the shed and move it where you want. And if the crane can travel to the site? Or territory ennobled and truck wheels passing beds, flower beds? What to do? Call for help of Archimedes and take advantage of his statement: "Give me a place to stand and I will move the Earth! '. In the article the real experience of how to raise and move hozblok using a jack and winch.

Content:

  • How to raise their own shed
  • How to move the shed and put it on a new foundation
  • Gradually shifting cabins

The rise of cabins: problem

Guk.

user FORUMHOUSE

I need to pick up and move the shed 8 meters. Size structure 3000h5000 mm. From the side of the road there is a gas pipe. Crane will not pass. How can I do without a paddle? I think, can winter over the ice drag or pull winch on a jeep? There is a simple and inexpensive solution to the problem?

masha120776

user FORUMHOUSE

instagram viewer

And I need to move a shed for 40 meters and turn it 180 degrees. The plot planted with trees. It stands the house, so there is no crane. I think we will proceed as follows:

  • Put on the ground of the board.
  • Raise hozblok jack.
  • Put under shed logs or metal pipes.
  • Will push workers.

 Normal plan?

Lifting and moving of cabins: decision

Users of the portal offered a way out.

Traks

user FORUMHOUSE

Independently raise and move the shed can be. It requires an integrated approach:

  • Define the location where you want to put the shed.
  • Lift jack shed.
  • Put it on temporary supports.
  • Put under the shed "rails" - timber.
  • On timber lay pipes - rollers.
  • Beat in the ground "anchor" - a tube.
  • Lower shed on the rollers.
  • Drag it with the help of a rope winch geared for "anchor".

To raise the shed you will need:

  • Hydraulic, m. N. "Bottle" jack load capacity of 3-5 tons.
  • Manual winch.

Ga $ tello advises to buy more:

  • Manual winch with a pulling force of 2-4 tons.
  • Steel cable with a diameter of 5-6 mm.
  • A couple of thimbles for rope.
  • Rope clamps and lifting brackets.

Further, the direction of movement cabins for prospective new installation site, drive into the ground "anchor" - a powerful area or channel. The "anchor" should be a hole for attaching a cable and a transverse stop, then to take it out jack.

And then - a trick:

  • Poddomkratte shed.
  • Enclose rollers and boards.
  • Secure the cable to the cabins.
  • Working winch and, alternately moving the tube-rollersDrag the shed where you need.
During hozbloka movement, changing the direction of cable traction, you can turn the shed. To finish the cable is not damaged cabins, the corners hozbloka enclose metal corners or cutting boards.

Ga $ tello

user FORUMHOUSE

I advise you to prepare in advance:

  • a pair of free jacks;
  • a pair of reliable crowbar;
  • Several powerful leverage - bar 100x100 mm thick boards or tube 50 mm in diameter and 3 m in length.

These things you might need at any time of advancing cabins. Good luck!

How to move a shed on their own

Having dealt with the theory, go to practice.

EXAMPLE 1

KOTLIN

user FORUMHOUSE

I have an office container 2x3 meters. Hozblok stands at the entrance to the site. After the construction of the house decided to pick up and move a shed in the middle of the plot. To this end, I bought:

  • jack 2 m;
  • bar section of 100x100 mm length of 6 m;
  • three-meter tube diameter of 51 mm.

The process of lifting and advancing cabins steps:

  • Lift the front of the cabins hydraulic jack.
  • Between the bars and the runners cabins prosunte metal pipes.
  • Raise the rear of the cabins.
  • Put the pipe.
  • Pull the shed.

Pulled a car shed.

Above, we have already mentioned, how to move the shed hand winch.

KOTLIN

I worked and son. One rearranged pipes and bars, watching the movement of the cabins, and the other taxied. At the new place under the shed made the foundation of 9 tires.

Module buildings raised above the foundation to a height of two bars.

We stopped.

We removed the pipe and put the shed on a new foundation.

Shed moved by 18 m.

EXAMPLE 2

Yaroslav081

I decided to move the shed size 3000h6000 mm at 10 meters. Jacks is. I put it under the shed bar "hundred" and pumped it into the pipes.

Stages advancing cabins:

  • User cleared the place and under the front cabins.
  • I bought and put "rails" - timber - 6 pcs.
  • I bought four metal tubes with diameter 89 mm.
  • Prepared by two jacks: hydraulic rack and 3 tons.
  • I lifted the back of the cabins.
  • Pulled upper concrete blocks 3, and put tube.
  • I lifted the front of the cabins. Removed blocks and put the fourth tube.
Shed pushed metal pipe. Advancing distance of 12 meters. On the left is 1:00.

Shed lowered in the reverse order:

  • Jacking the front part
  • 3 tubes removed
  • framed blocks
  • Raised rear portion,
  • Removed shed pipe and lowered into blocks.
  • Hozblok leveled by level.

conclusions

To lift and move the shed need 2-3 people. "Bottle" jack capacity up to 6 tons will cost 1500 - 2000 rubles. You can do without a winch, sliding hozblok lever or pull a car shed. The main thing - do not give up. It is beneficial or not - decide for yourself. Compare the cost of the rental of the manipulator and the prices for the purchase of equipment, if you do not have a hydraulic jack, a winch, pipe and cable. Do not forget to add your time spent, if you still want to move the shed yourself.

Learn more or to share their experience in the subject can be How to move a shed?

We recommend the article:

  • Construction hozbloka own hands: a personal experience, which is given step by step guide for self-construction of cabins.
  • Renovation of the cabins with their own hands or experience alterations kosyachny purchase cabins  quality in outbuildings.

In the video - lifting and shifting to a new house foundation.

Subscribe to the channel to join FORUMHOUSE!

One-storey house-sauna. Comfortable and functional 108 sq.m. with 3 bedrooms

One-storey house-sauna. Comfortable and functional 108 sq.m. with 3 bedrooms

Another option for convenient and functional house project: in a small area, a full-fledged and c...

Read More

Two phases in the outlet, I explain in detail what it is and how to fix it

Two phases in the outlet, I explain in detail what it is and how to fix it

Hello dear guests and subscribers of my channel. Today I want to talk with you about such a pheno...

Read More

What Our "Nervous" Habits Say

What Our "Nervous" Habits Say

Observing people, you can see that someone happily bites their nails, twitches their nose, crunch...

Read More

Instagram story viewer