Light, water and heat - the underlying factors for the suitability of housing for permanent residence. Therefore, when it comes to year-round operation of a country house, on the first place of its uninterrupted supply of electricity. Consider the basic rules of connection to the grid of a private house.
The owners of private houses have many questions related to the procedure properly connect their homes to the centralized power grid. FORUMHOUSE selected the most private ones. From our material you will learn:
- How to start a connection to the power grid for individuals;
- Proper connection to electricity at home: from what stage is this procedure;
- What documents require the connection of electricity in private homes;
- How long does it take to design and connect the power, and how much it costs;
- What if violated legislation on the electricity connection.
How to connect to the power grid of the country house
Natural person wants to perform the electrification of your home or suburban area with a house, and did not know where to start this procedure.
Implement any specific project will be easier if we look at a typical situation:
- Necessary consumer power - up to 15 kilowatts;
- A country house or cottage land is located in the "land of settlements."
Connection object to the grid consists of the following steps:
- Application for grid connection (TA) in the grid organization;
- Preparation and familiarization with the Treaty at the CAT and technical conditions (TU) of the grid organization;
- Conclusion of the Agreement with the electric grid organization;
- Fulfillment of electric installation works on the part of the applicant and the mains prescribed specifications. Mains performs work to the limits of the applicant's land area. The applicant (at their own expense) performs works prescribed by the TU within the borders of their land;
- Connection to the grid and the voltage supply (the mains after checking the execution requirements of specifications) for the applicant's power receiving unit (EPU);
- The signing of the TP documentation.
This is - a standard scheme for it and there is a connection to the grid of a private house. It defines a general algorithm action electrification land. However, there are some nuances to be aware of before you start collecting the necessary documents for the connection of domestic electricity.
First of all, it is necessary to find out the presence of the desired voltage grids, and their distance from the property line. At this moment we should focus.
User FORUMHOUSE Natalia Derkunskaya, forum name Natachka.
Natachka (User FORUMHOUSE):
The distance from the connection object to the desired voltage networks - this is a factor that directly affects the time and cost associated with the electrification of the house or plot.
If the distance (straight line) from the border area is not more than up to the nearest power:
- 300 meters - in the city;
- 500 meters - in the countryside.
If the required power, taking into account all previously of connected power consumers, does not exceed 15 kilowatts, in this case, according to the existing norms, the price of the connection should not exceed 550 rubles.
You have the right to request information where the necessary network in the local administration, by making the appropriate request, with a response to this request, free of charge.
The sum of 550 rubles. It includes:
- The fee for the issuance of the TU;
- Expenditure on TA.
Energy supply company (subject to the above requirements, and the distance required power) Does not require the additional cost of the applicant for laying the power supply before the border area.
Proper electrical connection in a private home: a list of documents
The list of documents required for submission to the RES, for many it becomes a real stumbling block in the issue of electrification and FORUMHOUSE often there are discussions about the mutual rights and obligations of the parties, such as "has the right to demand RES project when you connect a private home and the house at 220 5 kilowatts. "
The standard list of documents necessary for the conclusion of the agreement with RES, includes:
- Application, which states:
- Full name of the applicant;
- Passport data;
- Place Connection object - the actual address of the site, and (if any) house number;
- The project portion (scale diagram) showing the location of attached energy consumers. You must also specify the number, and the total capacity of each power;
- Copies of documents confirming the ownership of the house or land.
The exact list of required documents and filing procedures should be clarified in particular a Power the company since Requirements in Moscow and other cities and regions, depending on local conditions, may be slightly vary.
How to connect the electricity to the house: deadlines and delays
Based on the application filed by the applicant within one month from the date of its receipt Electric Grid Company produces:
- The contract for the TP;
- Technical conditions.
If the application lacks all the necessary information or is not accompanied by any documents, the grid has the right to notify the applicant within 6 working days.
Therefore correct to first thoroughly familiarize yourself with the power requirements and only then put his signature. The procedure is such that, if the applicant does not agree with the conditions of contract and specifications, he can be in Within a month (from the date of receipt of the documents) to send to the electricity grid reasoned refusal (Motootkaz).
In fact, to make a technological connection to the applicant's point of attachment at the mains have no more than 6 months. Period starts from the date of conclusion of the agreement between the applicant and the mains. Connect the longer she can not.
How to connect to the power grid - leverage.
Act regulated power supply 15 kW to the border area. Despite these clearly defined standards of electricity connections, it happens that after the submission of the application for technological connection of the applicant faces a number of difficulties. Namely:
- Power grid does not produce an agreement on the TP and TC;
- Power grid does not fit in the allotted to it under the law terms of technological connection.
To be able to defend their rights, it is necessary to know that:
- According to current regulations, required to stretch the mains line voltage required not more than 25 meters from the boundary area of the applicant;
- How to connect to the networks of the network organization are governed by the Rules of technological connection of power devices. These rules were approved by the Government. Decree number 861 of December 27, 2004;
- Because Network organizations are subjects of natural monopolies, they fall under the law on protection of competition. Federal Law № 135;
- The activities of the network organization is regulated, and going beyond the law suppressed by antitrust authorities, who may impose a penalty on that organization.
Natachka: (User FORUMHOUSE):
To connect the house to the mains (380V three-phase electricity), it took me 1 year and 8 months. All this time I was in communication and negotiation with the employees of the network organization, then (as were all violated the antimonopoly legislation) applied to the Office of the Federal Antimonopoly MO service.
That last decision has been the most effective step. This forced a network company (which faced fines) first issue new posts 10 kW on a temporary basis, and then connected on a permanent basis 15 kW. Despite the fact that the cost of implementation of measures on technological connection to the grid company exceeded 1.3 million rubles., For Natachki to connect to the grid worth 550 rubles.
Natachka (User FORUMHOUSE):
At his own expense I put: Electric meter and panel, insulated wires, an intermediate metal support and divorced electrician around the house. If there were difficulties, should not give up; to connect to electricity, it is necessary to defend their rights by legal means.
On FORUMHOUSE have the answers to all issues relating to the law on technological connection to the power grid, and the practice of technological connection to the power grid. You can also learn what documents must be collected for the connection to the mains and meet recommendations on putting electricity into the house. It will be useful and video legal advice on summarizing electricity.
Discuss the article and read other materials devoted to country life you can on the websiteFORUMHOUSE.
Subscribe to the channel so as not to miss the next release!