Useful content

Summer WC: first experience in construction

click fraud protection

Without waiting for the summer, in the winter, until the start of construction season, krus bought a cottage toilet and a plastic barrel to drain feces. Spring closer to the summer, it has acquired at favorable conditions and the cottage 16 podvoz concrete blocks 100 kg each. So slowly, he began to learn the basics of building certificates.

toilet construction

In the beginning, before build a toiletHe determined its location in the locality and the linear dimensions - 135h170 cm (after construction, it became clear that the toilet is a bit too big).

He then pointed out the location of the drain pit and dug it. I took the barrel and in the upper half nasverlil hole. The lower half has remained untouched for more active work "Saneksa".

Barrel inserted into the hole and sprinkled on the sides of river sand and pebbles. At the top of the barrel, in a circle, he made a clay castle. Install the drain barrel, he dug a small pit and made sand cushion under the concrete blocks. I set them and leveled on the level.

instagram viewer

Then purchased lumber 100x100 100x50 mm boards and 100h40 mm. For the construction of the sill and install the supporting pillars he used timber. And to facilitate the construction of the upper harness board made 100x50 mm.

To secure the sill beam krus drilled through perforator and entered the stone block 8 cm. I put in the corners bought in advance 180h16 anchor bolts and fixed piping.

Before installing the pillars had to the bottom of the column of drilling a hole to a depth of 2 cm extending from the sill anchor bolts. The height of the corner posts turned - 2.05 cm.

Cant (User FORUMHOUSE):
I forgot to put under the sill as a waterproofing roofing material, but the bar has processed 4 times ognebiozaschitoy and made a couple of vents.

Roof

Before the start of construction of the roof krus did not accurately measure the angle of inclination of the roof. Just I made it so, as it seemed the most appropriate. Then he made the rafters pattern from the thin boards and sawed him the required number of boards.


Installing rafters, he nailed him to the cross boards. Size cantrail boards, and cross trusses 100x50 cm. The construction of the roof is completed the installation of roofing - Ondulina and roof ready. Ondulin well sawn hacksaw on wood, soaked in oil.

decoration

To finish the outside walls of the toilet krus purchased vinyl siding. To simplify the work, he did not buy all the necessary details. He bought two finishing trims and three exterior angles. Siding sawed manual hacksaw. Scissors, metal turned bad.

Any structure is sheathed with siding from the bottom up. The first strap is fixed with screws. Subsequent latched to the lower part of the previous sheet, and are secured with screws from above. When laying siding reached the window opening, he went to the market and purchased a window and door and set them into place, and then continued siding sheathing toilet.

Installing a toilet

For the siding's turn to lay the floor. But there was a problem - how to combine and fix the toilet and the barrel under it? The fact that the barrel is round and oval hole toilet. And while pondering what to do, nailed to the door trim and window, finished off the siding, fixed visor above the door, he made the basis for the toilet.

To combine the toilet and the drain hole barrels he rolled galvanized sheet cone and an upper, wider towards its base secured to the floor, and lowered into the lower barrel drain. Galvanizing is attached freely, without interference in to the winter it can be compressed.

He also bought a jar automotive polishes lubrication places where docks galvanized, drum and floor boards. After fitting the toilet, it became clear that the diameter of the hole is less than the upper bowl diameter galvanized, which means that krus did everything correctly.

After installing the floor he has put on his toilet seat, swept inside the outlet pencil, it then sawed jigsaw. More he cut from galvanized strip 20 cm wide and attached it to the floor boards, and the projecting portions bent.

Made from the transfer belt pad, which is located between the floor and the toilet, he drilled a hole in the floor, missed all the mastic and fixed the toilet to the floor. Then, again from within all missed mastic. The design of the toilet bowl so that it does not need a tank. Chimney krus secured behind the toilet.

inner workings

Before construction krus warmed wanted to build a toilet, but then changed his mind. Bought windproof and stapler hooked it on all the walls. Facing the toilet made of lining. Having finished the toilet, he made a stair that is not affixed to it. Then made slopes, painted porch.

Weekly operational toilet has shown that it is worth buying for questioning. Due to the drawing, the smell in the toilet is almost there. The drain barrel krus sleep "Saneks", but despite this fact, the liquid in the barrel did not gray, it should be, but remained brown.

Subscribe to the channel and put the "Like" so as not to miss the next release!

Do not agree with the author, or find a mistake in the article - write about it in the comments!

Monolithic lintels in openings from permanent formwork. Spied on the technology from the pros

Monolithic lintels in openings from permanent formwork. Spied on the technology from the pros

On the first floor of my house, all the lintels are made monolithic - both above the windows and ...

Read More

Why didn't they produce cars with a drive like that of BelAZ before? E-POWER system 3.5 l / 100 km

Why didn't they produce cars with a drive like that of BelAZ before? E-POWER system 3.5 l / 100 km

Anyone familiar with heavy mining equipment knows that huge dump trucks are driven by electric mo...

Read More

New forms of magnetism found in graphene

New forms of magnetism found in graphene

A scientific group from the University of Cambridge discovered a new electronic property of such ...

Read More

Instagram story viewer