Repairs done in between times
It is believed that the repair - it is a long and complex. If you do it is thorough and thoroughly - then, yes, definitely. I'm after the wedding and moving to a new apartment set himself the task of "freshen" the room. Firstly, to make it cheaper. Secondly, it has not been particularly engaged in repair. It remained an option - to work, what is called, in fits and starts. In the evenings, after work. Based on this strategy, and I picked up the materials. Such that evryone can quickly handle a layman like me.
Ceiling
He painted his usual white paint. With a roller. It took 2 pm, as painted by 2 times. Ceiling moldings of polyurethane. Planted on the "liquid nails". While skirting and so white, but I have paint on it and walked as recommended. Nothing at all tricky. The only thing that because of the fact that the wall I do not justify, in two of the four corners of the baseboards agreed not very smoothly. But it is seen only if you look closely.
Walls
The walls, too, everything happened quickly and simply. Old wallpaper were pasted in a single layer, and no bubbles behind. Therefore, the new pasted directly on them. Without any prior training. One of the walls decorated with photo wallpapers. Separating their delicate white moldings.
Floor
To cope with the floor as quickly as possible, chose to cover it the good old stuff - linoleum. Thanks to a good thickness, he hid a small roughness. Size Fit by conventional roulette. Due to difference in roughness of the walls opposite ends was 2 centimeters. To attach the floor baseboards using dowel-nails had to be hired for the evening a good puncher. The only tool that would need to borrow. Everything else that I have used, is, I think, at your fingertips nearly every man. Skirting a little cut in the middle for the passage of the cable to the TV had only one place. It was very neat.
finishing touches
Chandelier hung effortlessly. To attach the curtain needed some time to set the same punch. Assembly of furniture left exactly one day. Wardrobe, bed and shelves in place - finished repair. At such a "refreshing" the room it took about a week of work only in the evenings, well, and sometimes at night, of course.
On that channel everyone can share its experience in the construction, repair and improvement of your home, suburban area, send photos, tell me about your country, house, apartment. And we will tell you about my little house on the canal. Information and photos (preferably horizontal) send to [email protected]