Following the acquisition of the site and to the construction of many major craftsmen house of our portal as "Pen test" build small houses - and practical experience in addition to the theory, and ready guesthouse in further. That's Ciberb I decided to start with a compact karkasnika, but not typical and original form, and not less than the original structural elements. A construction experience generously shared with everyone who is interested in this topic.
Filling the frame with straw bales with the foundation of the tire
The lucky owners of land in the fifteen hundred family of craftsmen began in early spring 2014, thanks to the program of the local authorities to allocate land for the construction of large families families. To pond who nisin, and they went to land on a hill with a slope to the exit to the road. The case for small - to grow roots, decided to start small.
Ciberb (User FORUMHOUSE):
After consulting with his wife, decided to build a small house, a temporary barracks, which would become a guest house or workshop. Since "our Ataman dumb gold reserve", even with the budget determined very quickly - on materials House of 150 thousand, its work may occasionally help from friends and relatives who live enough long away. So far, thank God, no one helped.
Training
house project in the shape of a ship with panoramic windows has been approved not only the entire family, but also forum users.
Similar examples on our website a lot, but this is interesting not only by the original constructive at home, but also a thorough approach to construction. Neither more nor less - to save money and optimize the production process / delivery of materials was purchased by truck.
Ciberb:
Since the construction of the planned budget is very, decided to buy a truck, and after watching a dozen pretty tired copies was purchased pepelats I called Hottabych. Dumps nealchnomu master thirty-five thousand hard-earned, hit on his hands. On the first day on the cutting board was welded onto "horns" for transportation shestimetrovki.
Further, in late August, craftsman "parachuted" into the field on his acquisition, simultaneously taking in the former the use of timber - about five cubic meters of dry timber and boards, which for three years had served well stable. Unique flavor craftsmen are not deterred, as he once engaged in horseback riding, plus lime treatment and disinfects and removes odor.
Site development began with an attempt to mow dead wood by hand - literally fifteen minutes have shown that not all so simple. Fortunately, only bought spit too broke down and broke. Was rescued by a neighbor is also our forumchanin with the nickname Garichev"Treated" Petrol trimmers. Two days with herbage was finished, it was the turn mark the foundation excavation and digging. All those who are only going to do this, be sure to whet craftsman advises new shovel - "life will be brighter."
Foundation
Since the building permit to the top of the building has not been received, Ciberb initially refused prismotrennogo pile foundation yew. Temporary House decided to put on the tires, so it does not fall under the category of capital structure. Used tires dug trench depth of 80 cm to minimize frost heave and mound of earth will be further insulated.
Before backfilling laid mortgage under water - at a depth of 1.5 meters, wrapping in several layers of insulation and let the heating cable. Also paved IPA under electrical cable and an outer sewer pipe, with the required bias towards the future septic tank.
For filling the trenches on HOTTABYCH introduced to the sand and gravel portion, on the outer walls of the trench to lay the geotextile extreme density of 100 g / m², from silting. it is between the trenches to lay on the ground to prevent the growth of grass beneath the house. Even a rough estimation shows that only fill the trench with gravel and sand - far from the budget construction, but the time on the roadside caught bottles - mixed rock and sand without impurities that can be melted and loosen the base. This rubble is almost enough for the first trench, the remaining trench bottles already bought locally based, came out cheaper CBC. Filling waterline, the rammer - the bottom 20 cm of sand, spilled, ramming, was packing pieces buta voids filled with gravel, shtykoval, sand again, and so on until the top level brought gravel layer. The area between the trenches lined the chosen land. Since the weight of the house presumably about thirty tons, according to estimates craftsman, concreting is not required - thirty-five and distribute tires give a load on firm ground.
Tires radius of 13 and 14 took a tire shop, give them the gift and be happy to be placed in such a way that they account for the frame counter. Tires stuffed with gravel, bending back side, to leave no voids.
As used waterproofing rubber printing plates, the level brought sheets of different thickness of plywood - sliced into squares and packed, guided by the tensioned thread.
Box
Beams strapping collected from the board 150 × 70 mm × 100 bar and 100 mm at the junctions and is fastened with nails "grouse" waistrail lime.
Assembled frame boxes, jib crashed into the rack, as mobile scaffold adapted Hottabych.
Ciberb:
The forests are removed, so look my one and a half months of work and forty-one thousand and a half rubles. Now, about the plans - a gable roof, as well as in the project, the eaves of the roof planned departure of 80 cm plus the thickness of the bale 50 cm, just thirty meters, the rafters, I think, inclined from the board of 50 mm to 200 mm. The largest herd - absence of the project. Not that it did not have, I have tried to sketch in the editor, but time was short, and throwing - the idea to insulate with straw, the sawdust. As a result, a project in mind, there are alterations, and neuchtonki.
The next step set the rack under the ridge pole, made a mezzanine under the children's bedroom and desk with struts in the wall under the picture window.
Construction continued on the cold, autumn was cold, with early frosts, which complicated the assembly, but not forced to stop by frost, even the desire to do "smoke breaks" disappeared. The problem with the lack of electricity in the area and the instantaneous discharge of the battery in the cold tool decided a diesel generator, which lent a neighbor - the world is not without good people. diesel mobility provided, again, the truck in which the craftsman helping neighbors, and they, in turn, helps him out. With one of these assistants dragged on top board for the ridge.
Skate assembly of four beams 100 × 150 mm, fixed to "gluhari" with offset joints, joined to the bottom row of carrier racks. Truss boards 50 × 200 mm dragged by one, baits, after assembly of the entire structure finally secured.
In the winter building left with a finished frame and truss system for the purpose of conservation Ciberb sheltered roof banners, and a box wrapped windscreen.
Despite conservation directly unfinished, resettlement process continued pressing of the button at the end of the winter well. Time is not chosen by chance - in this period, the lowest level of the groundwater. Well turned ten rings in the ground and one on the surface, the water is clean and tasty.
Everyone who is planning to build on the parent capital, our craftsman advises to lay plans for several months on the red tape. Its new building season because of force majeure began in August, of the good things - for this time spent on the electricity sector.
After placing the remaining lag on the floor and the terrace was the case for the roof - the wife were lucky to find the ads metal roofing with transoms in the right quantity and at a reasonable price. Before installing the tiles zabrashiroval stand and visible from the rafters, for filing board painted white.
Between rafters and boards filled before laying the windshield to provide a bearing straw bale and prevent spillage. With the laying of metal helped the eldest son, but had to finish alone. In its second winter "boat" went with a beautiful roof and last year's banner from the roof of the perimeter and the next budget.
Ciberb:
On the advice of friends I decided to consider all the details. To summarize this construction season, calculated that building the same as it was last year - two and a half months, just two hands, except for five days on a metal installation. I spent 170 thousand rubles, of which 120 thousand for materials, everything else - food, transportation, gasoline, buying a power tool. Total since the start of construction, money for materials spent 250 thousand rubles and five months of age.
For the next season was to finish the rough lining the walls, lay a floor, put the windows and doors, to hold communication - the house has electricity, water, sewerage.
And although there is still a large scope of work, the house pleases their views, and the host, and neighbors, and the rest will follow gradually when you want, skilled hands and Hottabych.
Learn all the details, and follow the further progress of the construction can be Topic author, Article an insulation with natural materials - Another interesting house with an unusual façade. In the video - the house in a Mediterranean style.