From the apartment in his house. Inzhenerki: Heating Equipment
Combined heating system (gas and electricity) in the building of the timber
Heating.
I have the entire installation "turnkey" system made familiar even with large-scale works in the office (900 m²) master Dima. In the office, he appeared after the installation of the system in a new house chef (very large house). In the winter they estimated the approximate volume of work, money, time. He is a specialist, offers the option of pointing out their pros and cons, the relationship in the system and the consequences certain decisions, but for me it was a final decision (oh, to me so suggested a gasholder options). As a result, some have come to the middle. I saved just as in the automation system, the thermal head (in vain, but my decision, literally saved every penny), water treatment, although he warned that this leads to an increase in losses and, accordingly, costs. But, for example, it was he who proposed and insisted to put in parallel to the gas and electric boiler, which was done. As a result, a large touch-assembled and are tied:
1. Boiler gas Logamax U072-35. A heating circuit in the second circuit to the boiler.
2. Electric boiler EVAN Warmos M-24 380.
Pumping unit for coolant supply to:
3. Right Pump - radiators rooms of the first and second floor;
4. Left pump thermostat - heated floors;
Warm floor under the whole first floor (see plan for redevelopment). In the hall of four (4) circuits and they are fully justified. In the kitchen two.
Paul first floor, should be discussed separately. The house stands on a strip foundation. The floors of the ground floor were on the beams. All removed, pilot controlled check valve is made with subsequent layers of crushed stone sand, expanded clay, heat insulation,... ties, t. E. All serious. And interestingly floor dropped by almost 13 cm, respectively, ceiling rose - and it is, oh, so important and well!
5. hot water boiler system with indirect heating and continuous circulation of water, not the most economical, but very convenient option.
6. cold water supply system from the pump in the well through the water treatment system (described previously) to the points.
7. Sewage in the house. Replacement of the old and the new gasket.
By the way, I stumbled upon a photo of the replacement pipe in the area.
Electric boiler was included in the heating system, but it did not work - was not let down a decent cable. Two winter season lived in the gas from the gas tank heating (described earlier). In general it is necessary to be honest, we did not save at the expense of comfort. If an adult exactly enough heat to 21-22 ⁰S in the hall, then we granddaughter on Friday include heated floors, on Sunday departure off. Well, what would you do if in the bedroom 24 ⁰S I under the sheet from the word almost, and his wife under the duvet nose sticks out? In-law the same as I am, but still loves the air, the window in the winter ventilation mode and the battery on the whole and daughter under the blanket? What a thermal head can help? So, distraction.
Earlier I wrote about air heat pump, in my case, a negative decision on it explained. But here the case, he got me a brand new, with the installation of turn-key, easy, free. Yes, it happens and it's a different story, will be announced later. HAIER air conditioning. He - air heat pump. According to his passport it works to -30 ⁰S, tested to -21 ⁰S (below were not), no complaints. I sometimes include it in the summer in the cold days, not to include the basic heating, as well as in the winter for a quick heating of the hall for her granddaughter. Well, for the sake of curiosity. Earlier this season, decided to play: disabled all the radiators in the room and in the kitchen (combined) and run the pump at the temperature of +18 ⁰S. As before, he showed himself very well keeps well. But. For two weeks it became clear he eats his kilowatts in denezhek mode is good, and the lower the temperature, the more joyful. And we, taking into account the daily rate, sadly. Very sensitive I tell you. Reiterated (in my case) - no more than a reserve.
Quest solutions searched and here on the forum. like himself, and is not a fool, but not reached, I read here, the price of electricity by nightly rates per kilowatt of heat accurately cheaper gas prices. The task was - gas boiler should run from 6 to 23, with electric 23.00 to 6.00. Electric boiler is included in the heating system, but it has not worked as a consequence of the lack of cables. I had just shoveled the opening cabinet and from the stretch cord to the boiler, almost no worse than what goes into the house.
I set a simple timer (pictured left) of Leroy with two independent channels of temperature sensors tear boilers and programmed switching off with a small time lag. In the circuit switched and the room temperature sensor. Accordingly, the timer opens the channel in 23.00 gas boiler temperature, disabling it closes the other channel including an electric boiler (heating spirals). At 6.00 on the contrary. If a temperature sensor in the room to work off, both boilers will be switched off in any case timer. Included. Gas works electro in standby mode. He came to 23.00 as the clock in a gas torch will not light, electric klatsnul (incidentally, it klatsat that the opening that the closure notably) hot to go through the pipes. We went to bed. 6.00 in the morning to run on peresmenu. Just like clockwork, on the contrary.
What is important and can be clearly seen:
- In terms of money the electric heating of the whole house for two weeks during the night turned out much cheaper than room heating "room + kitchen" heat pump in economy mode.
- At the same time these games, experiments with electric heating led to a marked drop in gas consumption (traces, although not in detail, the scale does not allow). In this case the outside temperature of the year is almost identical with the temperature of the past.
What I expect as a result of:
- Gas should last until the summer. I think enough.
- Costs in the amount of gas heating and electricity should drop compared to last year's costs.
In general, much of the month it will be clear what we are going.
We have reached the stage of heating the coolant. The following post was supposed to - heat management.
But no, there is something to add. At the stage of the organization of the boiler having two completely unexpected nuance. They are technical, and can be skipped.
Previous post - Networks: heating, gas.
Next post - Networks: boiler room, nuances.