Easy! A latent threat to the integrity of the concrete.

click fraud protection

When I filled my Laying nets, Then immediately decided that at least two weeks he should stand. Although I have seen many examples where Construction continued for five days, or even less.

And who is right ???

Pouring monolithic Laying nets, everyone wants to bear on a decent load, but it does not give concrete normally ripen?
Why, many argue that the foundation must be at least a month, and better throughout the winter, and at the same time put a roof on the freshly poured Laying nets?

These issues are the first to come to mind(I, at least), When I see examples of "fast work."

Therefore, one needs to understand.

1️⃣ Fitting Position.

❗ stasis want to mention that if Laying nets, between the first and second floors, and poured it into a U-blocks or similar structures, it seems to me that laying can continueIf not the next day, then after a couple - for sure!

I talk more about the option when Laying nets relies directly rafters or joists, or all at once.

So in this case, many within a few days of starting to work guided by the following:

instagram viewer

2️⃣ A gradual increase in load.

Like, until Kinema mauerlat until mark up the rafters, while start to put (and not all at once), Then Laying nets just pick strength.

Especially because there is another nuance.

3️⃣ Load distribution.

There is a view from the rafters, or floor, through mauerlat. Which the presses on Laying nets are not dotted and the entire plane.

And like all true ...

But there is a latent threat.

👉 Tie rods. 👈

❗ In my opinion, these compounds is the weakest point.

I'm not talking about the version with anchors in the "fresh" Laying nets. There just is simply the destruction of unripened concrete expansion anchors. Of course everything is kept, so far. But in comparison with a similar fixture in fine matured concrete - it's nothing.

But if, like me, when the stud is a mortgage, and poured concrete, there is a risk.

That's when you install mauerlat when tightening the screws, in a good effort as possible, if you do not pull the pins out of unripened concrete, the cause internal injuries in a solution, just maybe.

And over time, it is not known how it will affect.

So I just decided.

  • I am waiting for two weeks (at that time already elapsed time).
  • Initially, I will not, as far as possible to tighten the nuts when mounting mauerlat. Then you can always pull up.

I am waiting for your opinion on this issueAnd always 💥SUBSCRIBE TO CHANNEL💥 and put Like 👍.

Russian scientists have found a way to turn diamond into metal

Russian scientists have found a way to turn diamond into metal

Russian physicists from Skoltech, together with colleagues from the Massachusetts Institute of Te...

Read More

Great craft for school: Quickly and easily build a birdhouse with your own hands

Great craft for school: Quickly and easily build a birdhouse with your own hands

Well, is the time for autumn crafts and homemade bird feeders already in your schools? Our child ...

Read More

Filament lamps, what they are and what are their main disadvantages and advantages

Filament lamps, what they are and what are their main disadvantages and advantages

We have long been accustomed to LED lighting and LED lamps can be found for every taste and walle...

Read More

Instagram story viewer