When I filled my Laying nets, Then immediately decided that at least two weeks he should stand. Although I have seen many examples where Construction continued for five days, or even less.
And who is right ???
Pouring monolithic Laying nets, everyone wants to bear on a decent load, but it does not give concrete normally ripen?
Why, many argue that the foundation must be at least a month, and better throughout the winter, and at the same time put a roof on the freshly poured Laying nets?
These issues are the first to come to mind(I, at least), When I see examples of "fast work."
Therefore, one needs to understand.
1️⃣ Fitting Position.
❗ stasis want to mention that if Laying nets, between the first and second floors, and poured it into a U-blocks or similar structures, it seems to me that laying can continueIf not the next day, then after a couple - for sure!
I talk more about the option when Laying nets relies directly rafters or joists, or all at once.
So in this case, many within a few days of starting to work guided by the following:
2️⃣ A gradual increase in load.
Like, until Kinema mauerlat until mark up the rafters, while start to put (and not all at once), Then Laying nets just pick strength.
Especially because there is another nuance.
3️⃣ Load distribution.
There is a view from the rafters, or floor, through mauerlat. Which the presses on Laying nets are not dotted and the entire plane.
And like all true ...
But there is a latent threat.
👉 Tie rods. 👈
❗ In my opinion, these compounds is the weakest point.
I'm not talking about the version with anchors in the "fresh" Laying nets. There just is simply the destruction of unripened concrete expansion anchors. Of course everything is kept, so far. But in comparison with a similar fixture in fine matured concrete - it's nothing.
✅ But if, like me, when the stud is a mortgage, and poured concrete, there is a risk.
That's when you install mauerlat when tightening the screws, in a good effort as possible, if you do not pull the pins out of unripened concrete, the cause internal injuries in a solution, just maybe.
And over time, it is not known how it will affect.
So I just decided.
- I am waiting for two weeks (at that time already elapsed time).
- Initially, I will not, as far as possible to tighten the nuts when mounting mauerlat. Then you can always pull up.