Studs in Laying nets. I do the most reliable option.
Embedded in the concrete, in my opinion - is the most reliable method of fixing. However, there are different options.
β When it comes to securing the reliability of the overlap and the roof, the better not to waste time on trifles.
And so, I have everything ready for pouring Laying nets, one last very important point.
Pins for securing mauerlat.
To this end, I have decided not to buy ready-made, and to saw most of the meter bars. Diameter taken with a margin - 20 mm.
I sawed to size and ready. Those studs, only cheaper. Can be inserted into the formwork and pour concrete.
But I decided to modify them slightly.
For better fixing in the formwork prior to pouring, and to operate reliably in the future, I decided to weld the additional cross-pieces of reinforcement.
- Firstly, it will sit in a concrete stud more reliable than one thread.
- And secondly, it is an additional support for the valve to fill. π
- And along with all the reinforcement is obtained integrally
β time for a revision, I spent a little bit, but now, I'm pretty sure about the reliability of the fixing.
For a couple of hours, their inexperienced hands, I cut and Navariya's a bunch of "crosses" .π
But their installation - is a different story. As always, it is not so simple turned out.
π₯SUBSCRIBE TO THE CHANNELπ₯ and put the Huskies. π To be continued ...