How to make an apartment from the developer
After receiving the developer permission to enter the house or into operation, it is obliged to invite the shareholders to carry out acceptance of the apartment. From the construction care and literacy of the future tenants depends on who will pay for the removal of imperfections (you or the developer) and comfortable whether you will live in an apartment.
In this article, read how not to be trapped with the acceptance of the apartment.
What documents to bring?
- the original purchase agreement or the equity contract.
- acceptance if the apartment realize you and the owners of the documents the apartment - your parents or relatives, make a power of attorney
- You should be alerted if a seller offers the very beginning, "not looking" to sign the act of reception and transmission.
In any case, no matter how safe you would not seem the developer, do not give up on the inspection of the apartment. Inspect the apartment and make a list of defects.
What to bring?
• A light bulb - check cartridges
• Clock and Lamp - check outlet
• Flashlight (examine communications)
• Notebook and pen
• chalk or marker - noted deficiencies
• Roulette - to fathom the real quadrature apartments
Record all deficiencies that find and builders do not believe a word: do not sign the act of reception and transmission.
1. Entrance. Check closers on doors. Look, whether smooth plaster on the walls, if the cold window, whether the whole frame, if garbage shared balcony closed miss. At least one of the elevators should work. From within the builders usually sheathe plywood elevators, not to scratch the wall when transporting building materials.
We bought an apartment on the top floor?
Go to the attic and inspect the roof and floor.
We bought an apartment on the first floor?
It is worth visiting the cellar and check whether there is no flow pipe.
Apartment
In "Subject of the contract" in subparagraph "object data" should be recorded all the exact parameters of the apartment. Check them against reality!
Where to write
After inspecting the apartments include all the defects in a defective act and force builders to redo all the defects to your next visit.